WELL · 42-475-30686 · DISTRICT 8

University "18-18" #1

Plugged

Ward County  · Vertical

University "18-18" #1 (API 42-475-30686) is a plugged well in Ward County, plugged September 21, 2021, last operated by Wtg Exploration.

The RRC has issued 5 drilling permits between 1978 and 2008, permitted to 15,000 ft.

Completion filings report one formation top, including Lamar.

Its 2 leases have reported 7.98K barrels of oil and 31.2K mcf of gas since November 2005, last reporting in October 2023. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

WTG Exploration

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Feb 26, 2026
Permits on file
269
Phone
(432) 682-4030

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsOasis Petroleum Permian LLCthrough May 2018
Latest permitWTG ExplorationOct 3, 2008
15,000
total depth, ft
5
permits on file
Oct 3, 2008
last permit issued
—
completed
7.98K
cumulative oil, bbl
31.2K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2005 THROUGH Oct 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
Sep 21, 2021

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
University "18-18" O-10-39337Two Georges (Bone Spring)Callon Permian II, LLC16.52K24.3KJan 2009 – Oct 2023
University "18-18" O-10-38035Poquito (Delaware)WTG Exploration11.46K6.86KNov 2005 – Dec 2018

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1WTG ExplorationDec 2005 → Nov 2016
  2. 2Forge Energy, LLCJan 2017 → Jan 2018
  3. 3Oasis Petroleum Permian LLCFeb 2018 → May 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
671409-99RecompletionWTG ExplorationSep 18, 2008Oct 3, 2008Aug 19, 200812,000
608399-99ReenterWTG ExplorationOct 24, 2005Oct 27, 2005Oct 18, 200515,000
81118-99RecompletionAmoco Production CompanyMay 14, 1980May 14, 1980—11,500
42369-99RecompletionAmoco Production CompanyFeb 12, 1979Feb 12, 1979—7,700
22157-99OtherAmoco Production CompanyApr 14, 1978Apr 14, 1978—13,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-38035————
—— O-10-39337————

Formation tops

As filed on W-2/G-1. Subsea from 2,753 ft elevation.Download CSV →

FormationMD ftSubsea
Lamar5,024-2,271

Perforations

Perforated and open-hole intervals.

FromToType
5,0645,150Perforated
6,1496,158Perforated
11,06211,176Perforated
11,11811,174Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
20820261,300 S
13.3755,00017.53,700 S
2.37510,000——
10.7511,17712.52,210 S
10.7511,50012.52,210 S
2.87514,310——
7.7515,3909.5875 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 10, 2009Mar 5, 2009Yes
00Jun 16, 2009Dec 22, 2005Yes
00May 14, 2007Dec 22, 2005Yes
00Mar 9, 2007——
00Jan 12, 1984Jun 28, 1979—
00Jan 12, 1984Jan 26, 1979—
00Jan 12, 1984Jun 11, 1975—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47530686, documented in the API reference.