WELL · 42-475-31588 · DISTRICT 8

T. B. Pruett et al Gas Unit #4

N

Ward County  · Vertical

T. B. Pruett ET AL Gas Unit #4 (API 42-475-31588) is a permitted well in Ward County filed by Gulf Oil Corp.; no completion report is on file yet.

The RRC has issued 3 drilling permits between 1977 and 1984, permitted to 19,800 ft.

Completion filings report 6 formation tops, including Lamar, Bell Canyon, Cherry Canyon, Brushy Canyon.

Its 2 leases have reported 57.8K barrels of oil and 36K mcf of gas since January 1993, last reporting in June 2018. The leases carry 4 wells, so these are lease totals, not this well alone.

Operator of record

Gulf Oil Corp.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Apr 4, 1985
Permits on file
4,382
Phone
(713) 754-9729

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsOXY USA Inc.through Mar 2018
Latest permitGulf Oil Corp.Jul 24, 1984
19,800
total depth, ft
3
permits on file
Jul 24, 1984
last permit issued
—
completed
57.8K
cumulative oil, bbl
36K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jun 2018

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pruett, T.B. et al Gas Unit O-10-41545Phantom (Wolfcamp)OXY USA Inc.25.59K7.43KMar 2012 – Jun 2018
Pruett, T.B. et al Gas Unit O-10-29295Vermejo, E. (Wolfcamp)OXY USA Inc.252.2K28.6KJan 1993 – Aug 2012

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pennzoil Petroleum CompanyJan 1993 → Jan 1995
  2. 2Pennzoil Exploration & Prod. Co.Feb 1995 → Mar 1995
  3. 3Maynard Oil Co.Apr 1995 → Aug 1995
  4. 4Saga Petroleum Corp.Sep 1995 → Dec 1998
  5. 5Saga Pet. Ltd Liability Co of CoJan 1999 → Apr 2004
  6. 6Latigo Petroleum Texas, LPMay 2004 → Feb 2008
  7. 7OXY USA Inc.Mar 2008 → Mar 2018

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
245838-99RecompletionGulf Oil Corp.Sep 21, 1984Jul 24, 1984—19,275
43293-99DrillGulf Oil Corp.Feb 12, 1979Feb 12, 1979Sep 28, 197719,255
6185-99DrillGulf Oil Corp.Aug 24, 1977Aug 24, 1977Sep 28, 197719,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-29295————
—— O-10-41545————

Formation tops

As filed on W-2/G-1. Subsea from 2,697 ft elevation.Download CSV →

FormationMD ftSubsea
Lamar4,854-2,157
Bell Canyon4,888-2,191
Cherry Canyon5,850-3,153
Brushy Canyon6,951-4,254
Bone SpringBONE SPRINGS SHALE8,282-5,585
Wolfcamp10,926-8,229

Perforations

Perforated and open-hole intervals.

FromToType
10,96711,123Perforated
16,22117,055Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
3030——
201,100261,700 S
13.3754,82017.53,200 S
10.7511,80012.252,800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 18, 2012Aug 29, 1984—
00Nov 12, 1984Aug 29, 1984—
00Oct 27, 1984——
00Jan 12, 1984Mar 5, 1979—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47531588, documented in the API reference.