WELL · 42-475-31676 · DISTRICT 8

Walker Rhoda Oil Unit NO.1 #2

Shut in

Ward County · Rhoda Walker (Canyon 5900) field · Shut IN  · Vertical

Walker Rhoda Oil Unit NO.1 #2 (API 42-475-31676) is a well in Ward County operated by Nesitor West Texas LLC, completed June 12, 1994 and listed as shut in on the RRC schedule, shut in May 1, 2007.

The RRC has issued one drilling permit, issued December 13, 1977, permitted to 6,700 ft.

It was permitted by Exxon Corp. and has since transferred to Nesitor West Texas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including La Mar, Bell Canyon, Cherry Canyon.

Its lease has reported 32.5K barrels of oil and 251K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Nesitor West Texas LLC

Permitted by Exxon Corp.; the EWA schedule now lists a different operator.

Based in
Frisco, TX
P-5 status
Delinquent (D)
P-5 last filed
Feb 22, 2021
Phone
(469) 971-4503

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleExxon Corp.
Production reportsLario Oil & Gas Companythrough Oct 2007
Latest permitExxon Corp.Dec 13, 1977

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,700
total depth, ft
1
permits on file
Dec 13, 1977
last permit issued
Jun 12, 1994
completed
32.5K
cumulative oil, bbl
251K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jun 12, 1994
Shut in
May 1, 2007
Plugged
—

Operator's P-5 on the schedule: Delinquent (D)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Walker, Rhoda Oil Unit NO.1 O-10-25050Rhoda Walker (Canyon 5900)Nesitor West Texas LLC232.5K251KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pittencrieff America, Inc.Jan 1993 → Sep 2001
  2. 2Lario Oil & Gas CompanyOct 2001 → Oct 2007

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
13946-99DrillExxon Corp.Dec 13, 1977Dec 13, 1977Feb 23, 19786,650

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 12, 1994Walker Rhoda Oil Unit NO.1 O-10-25050Rhoda Walker (Canyon 5900)Nesitor West Texas LLCShut IN · shut in May 1, 20076,700
Mar 13, 1978Avary G. Q. Jr. O-10-24115Rhoda Walker (Canyon 5900)Exxon Corp.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,699 ft elevation.Download CSV →

FormationMD ftSubsea
LA Mar5,148-2,449
Bell Canyon5,188-2,489
Cherry Canyon5,960-3,261

Perforations

Perforated and open-hole intervals.

FromToType
6,1046,110Perforated
6,1886,196Perforated
6,2666,269Perforated
6,2716,273Perforated
6,3086,310Perforated
6,3126,314Perforated
—6,314Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,50012.25650 S
4.56,6997.875675 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 8, 1994Jul 20, 1994—
00Jan 12, 1984Mar 30, 1978—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47531676, documented in the API reference.