WELL · 42-475-31980 · DISTRICT 8

State -AL- #1

Y

Ward County · Caprito (Delaware Middle) field · Shut IN  · Vertical

State -AL- #1 (API 42-475-31980) is a well in Ward County operated by Continental Resources Inc., completed April 12, 2000 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued November 2, 1979, permitted to 7,000 ft.

It was permitted by Mobil Oil Corporation and has since transferred to Continental Resources Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Bell Canyon, Cherry Canyon.

Its lease has reported 417K barrels of oil and 1.41M mcf of gas since January 1993, last reporting in July 2026. The lease carries 7 wells, so these are lease totals, not this well alone.

Operator of record

Continental Resources Inc.

Permitted by Mobil Oil Corporation; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
552
Phone
(405) 234-9000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleContinental Resources Inc.
Production reportsContinental Resources, Inc.through Nov 2022
Latest permitMobil Oil CorporationNov 2, 1979

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,000
total depth, ft
1
permits on file
Nov 2, 1979
last permit issued
Apr 12, 2000
completed
417K
cumulative oil, bbl
1.41M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Apr 12, 2000
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 7 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
State -AL- O-10-25909Caprito (Delaware Middle)Continental Resources, Inc.7417K1.41MJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Mobil Producing TX. & N.M. Inc.Jan 1993 → Oct 1996
  2. 2Titan Resources I, Inc.Nov 1996 → May 2000
  3. 3Pure Resources, L.P.Jun 2000 → Mar 2006
  4. 4Chevron Midcontinent, L.P.Apr 2006 → Mar 2022
  5. 5Continental Resources, Inc.Apr 2022 → Nov 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
62766-99DrillMobil Oil CorporationNov 2, 1979Nov 2, 1979Feb 27, 19807,000

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-25909————

Formation tops

As filed on W-2/G-1. Subsea from 2,673 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon4,920-2,247
Cherry Canyon6,088-3,415

Perforations

Perforated and open-hole intervals.

FromToType
5,5605,732Perforated
5,5605,934Perforated
5,7705,802Perforated
6,0226,120Perforated
6,0226,508Perforated
6,1326,178Perforated
6,4866,508Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6252,47512.251,800 S
8.6252,475——
2.8756,220——
5.56,6007.8752,200 S
5.56,600——

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 19, 2000May 25, 2000—
00Jul 19, 1990Jun 26, 1990—
00Jul 9, 1984Jun 20, 1984—
00Jan 12, 1984Jun 20, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47531980, documented in the API reference.