TEXAS · WELLS · WARD COUNTY · API 42-475-32165 · DISTRICT 7B
Johnson -A- #17
Ward County · Ward-Estes North field · Temp Abandoned · Vertical
Johnson -A- #17 (API 42-475-32165) is a well in Ward County operated by Two P Partners LLC, completed November 15, 1980 and listed as temp abandoned on the RRC schedule, shut in January 1, 2022.
The RRC has issued one drilling permit, issued August 4, 1980, permitted to 3,202 ft.
It was permitted by Bass Enterprises Production CO. and has since transferred to Two P Partners LLC on the wellbore schedule.
Completion filings report 2 formation tops, including Yates, Queen.
Its 2 leases have reported 112K barrels of oil and 375K mcf of gas since January 1993, last reporting in July 2026. The leases carry 17 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Bass Enterprises Production Co.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 11, 2026
- Permits on file
- 1
- Phone
- (281) 893-9400
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Two P Partners LLC |
| Production reports | Two P Partners, LLCthrough Dec 2021 |
| Latest permit | Bass Enterprises Production Co.Aug 4, 1980 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 3,202
- total depth, ft
- 1
- permits on file
- Aug 4, 1980
- last permit issued
- Nov 15, 1980
- completed
- 112K
- cumulative oil, bbl
- 375K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 15, 1980
- Shut in
- Jan 1, 2022
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 17 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Johnson -A- G-10-290491 | Ward-Estes, North | Two P Partners, LLC | 1 | 0 | 1.35K | Mar 2019 – Jul 2026 |
| Johnson -A- O-10-7350 | Ward-Estes, North | Two P Partners, LLC | 16 | 112K | 373K | Jan 1993 – Sep 2024 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Bass Enterprises Production Co.Jan 1993 → Feb 2003
- 2BC Operating, Inc.Mar 2003 → Oct 2004
- 3Celero Energy, L.P.Nov 2004 → Sep 2005
- 4Whiting Oil and Gas CorporationOct 2005 → Oct 2016
- 5Four Corners Petroleum II, LLCNov 2016 → Mar 2021
- 6Two P Partners, LLCApr 2021 → Dec 2021
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 88605-99 | Drill | Bass Enterprises Production Co. | Aug 4, 1980 | Aug 4, 1980 | — | 3,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 15, 1980 | Johnson -A- G-10-290491 | Ward-Estes North | Two P Partners LLC | Temp Abandoned · shut in Jan 1, 2022 | 3,202 |
| Jan 4, 1981 | Johnson -A- O-10-7350 | Ward-Estes North | Two P Partners LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,569 ft elevation.Download CSV →
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 2,362 | 3,118 | Perforated |
| 2,970 | 3,118 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 894 | 12.25 | 400 S |
| 2.375 | 2,958 | — | — |
| 5.5 | 3,202 | 7.875 | 600 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | May 6, 2021 | Mar 8, 2021 | — |
| 00 | Jan 12, 1984 | Jan 14, 1981 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-32165 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-32165 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47532165, documented in the API reference.