WELL · 42-475-32714 · DISTRICT 8

Hall #3

Y

Ward County · Rhoda Walker (Canyon 5900) field · Shut IN  · Vertical

Hall #3 (API 42-475-32714) is a well in Ward County operated by Nesitor West Texas LLC, completed September 12, 1997 and listed as shut in on the RRC schedule.

The RRC has issued one drilling permit, issued September 30, 1982, permitted to 6,900 ft.

It was permitted by Monsanto Company and has since transferred to Nesitor West Texas LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Rustler, Delaware, Cherry Canyon.

Its lease has reported 228K barrels of oil and 958K mcf of gas since January 1993, last reporting in July 2026. The lease carries 8 wells, so these are lease totals, not this well alone.

Operator of record

Nesitor West Texas LLC

Permitted by Monsanto Company; the EWA schedule now lists a different operator.

Frisco, TX · P-5 Y, filed Nov 4, 2025 · (469) 974-4503

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleNesitor West Texas LLC
Production reportsNesitor West Texas LLCthrough Sep 2019
Latest permitMonsanto CompanySep 30, 1982

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,900
total depth, ft
1
permits on file
Sep 30, 1982
last permit issued
Sep 12, 1997
completed
228K
cumulative oil, bbl
958K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 12, 1997
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Delinquent

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 8 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hall O-10-27514Rhoda Walker (Canyon 5900)Nesitor West Texas LLC8228K958KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pittencrieff America, Inc.Jan 1993 → Sep 2001
  2. 2Lario Oil & Gas CompanyOct 2001 → Sep 2016
  3. 3Crossing Rocks Energy, LLCOct 2016 → Mar 2018
  4. 4Enwater Operating, LLCApr 2018 → Jan 2019
  5. 5Waterbridge Texas Operating LLCFeb 2019 → Feb 2019
  6. 6Nesitor West Texas LLCMar 2019 → Sep 2019

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
173306-99DrillMonsanto CompanySep 30, 1982Sep 30, 1982Nov 3, 19826,900

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-27514————

Formation tops

As filed on W-2/G-1. Subsea from 2,606 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler1,902704
DelawareDELAWARE LIME5,008-2,402
DelawareDELAWARE LINE5,008-2,402
DelawareDELAWARE SD5,065-2,459
Cherry Canyon5,850-3,244

Perforations

Perforated and open-hole intervals.

FromToType
6,1606,522Perforated
6,2686,324Perforated
6,4426,472Perforated
6,4426,522Perforated
6,4986,522Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.7533417.5600 S
13.37533417.5600 S
9.6252,63912.251,175 S
9.6252,6397.8752,075 S
2.8756,360——
5.56,8947.8752,075 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 5, 1997Oct 9, 1997—
00Mar 10, 1986Feb 25, 1986—
00Jan 12, 1984Dec 23, 1982—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47532714, documented in the API reference.