WELL · 42-475-33487 · DISTRICT 8

University 11-18 -B- #2

Shut in

Ward County · War-Wink S. (Wolfcamp) field · Shut IN  · Vertical

University 11-18 -B- #2 (API 42-475-33487) is a well in Ward County operated by Continental Resources Inc., completed December 8, 1984 and listed as shut in on the RRC schedule, shut in October 1, 2020.

The RRC has issued one drilling permit, issued August 22, 1984, permitted to 11,360 ft.

It was permitted by Getty Oil CO. and has since transferred to Continental Resources Inc. on the wellbore schedule.

Completion filings report 5 formation tops, including Bell Canyon, Cherry Canyon, Brushy Canyon, Bone Spring.

Its lease has reported 338K barrels of oil and 383K mcf of gas since January 1993, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Continental Resources Inc.

Permitted by Getty Oil Co.; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
552
Phone
(405) 234-9000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleContinental Resources Inc.
Production reportsContinental Resources, Inc.through Jun 2024
Latest permitGetty Oil Co.Aug 22, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,360
total depth, ft
1
permits on file
Aug 22, 1984
last permit issued
Dec 8, 1984
completed
338K
cumulative oil, bbl
383K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 8, 1984
Shut in
Oct 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
University "11-18" -B- O-10-24483War-Wink, S. (Wolfcamp)Continental Resources, Inc.2338K383KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 4(-100%)

024202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Mar 2022
  3. 3Continental Resources, Inc.Apr 2022 → Jun 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
249109-99DrillGetty Oil Co.Nov 21, 1984Aug 22, 1984—11,600

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 8, 1984University 11-18 -B- O-10-24483War-Wink S. (Wolfcamp)Continental Resources Inc.Shut IN · shut in Oct 1, 202011,360

Formation tops

As filed on W-2/G-1. Subsea from 2,787 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon5,112-2,325
Cherry Canyon6,006-3,219
Brushy Canyon7,288-4,501
Bone SpringBONE SPRINGS8,656-5,869
Wolfcamp11,094-8,307

Perforations

Perforated and open-hole intervals.

FromToType
11,25511,307Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
11.7542814.75580 S
8.6255,08010.6251,080 S
5.511,0007.8752,895 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 21, 1985Jan 9, 1985—
00Feb 20, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47533487, documented in the API reference.