WELL · 42-475-33489 · DISTRICT 8

State of Texas "DP" #3

N

Ward County  · Vertical

State Of Texas "DP" #3 (API 42-475-33489) is a permitted well in Ward County filed by Texaco Inc.; no completion report is on file yet.

The RRC has issued 2 drilling permits between 1984 and 1985, permitted to 6,850 ft.

Completion filings report 2 formation tops, including Bell Canyon, Cherry Canyon.

Operator of record

Texaco Inc.

Based in
Midland, TX
P-5 status
Inactive (I)
P-5 last filed
Nov 27, 1996
Permits on file
4,906
Phone
(432) 688-4643

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsJetta Operating Company, Inc.through Apr 2026
Latest permitTexaco Inc.Jan 4, 1985
6,850
total depth, ft
2
permits on file
Jan 4, 1985
last permit issued
—
completed
0
cumulative oil, bbl
947K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
—
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
State of Texas "DP" G-10-114469Quito, East (Cherry Canyon)Jetta Operating Company, Inc.10947KJan 1993 – Jul 2026

Gas, mcf lease total

Last 12 months 17,502 · prior 12 11,052(+58%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → Jun 1994
  2. 2Olsen Energy Inc.Jul 1994 → Jun 2014
  3. 3Martin, Jimmy IncJul 2014 → Sep 2023
  4. 4Jetta Operating Company, Inc.Oct 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
263245-99DrillTexaco Inc.Nov 26, 1984Jan 4, 1985—6,850
250505-99DrillTexaco Inc.Aug 31, 1984Sep 6, 1984Oct 2, 19846,850

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-114469————

Formation tops

As filed on W-2/G-1. Subsea from 2,799 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon5,045-2,246
Cherry Canyon5,980-3,181

Perforations

Perforated and open-hole intervals.

FromToType
6,4246,472Perforated
6,4816,496Perforated
6,6356,649Perforated
6,6886,701Perforated
6,7056,721Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,26612.25800 S
5.56,8427.8752,760 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jan 28, 1985Dec 6, 1984—
00Jan 24, 1985Nov 12, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47533489, documented in the API reference.