WELL · 42-475-33703 · DISTRICT 8
University 10-18 B #6
Ward County · Block 18 (Cherry Canyon) field · Vertical
University 10-18 B #6 (API 42-475-33703) is a well in Ward County operated by Texaco E & P Inc., completed October 22, 1995.
The RRC has issued one drilling permit, issued November 22, 1985, permitted to 6,850 ft.
It was permitted by Texaco Producing Inc. and has since transferred to Texaco E & P Inc. on the wellbore schedule.
Completion filings report 3 formation tops, including Lamar, Bell Canyon, Cherry Canyon.
Its 3 leases have reported 124K barrels of oil and 1.01M mcf of gas since January 1993, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Texaco Producing Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jan 22, 2003
- Permits on file
- 3,332
- Phone
- (281) 561-3713
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Texaco E & P Inc. |
| Production reports | Continental Resources, Inc.through May 2023 |
| Latest permit | Texaco Producing Inc.Nov 22, 1985 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 6,850
- total depth, ft
- 1
- permits on file
- Nov 22, 1985
- last permit issued
- Oct 22, 1995
- completed
- 124K
- cumulative oil, bbl
- 1.01M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 22, 1995
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| University 1018 -B- O-10-30033 | Block 18 (Cherry Canyon) | Continental Resources, Inc. | 4 | 124K | 422K | Jan 1993 – Jul 2026 |
| University 10-18 "B" G-10-157394 | Block 18 (Cherry Canyon) | Texaco E & P Inc. | 1 | 0 | 284K | Feb 1996 – Jan 2001 |
| University 10-18 "B" G-10-131944 | Block 18 (Cherry Canyon) | Texaco E & P Inc. | 1 | 0 | 301K | Jan 1993 – Nov 1995 |
Oil, barrels lease total
Last 12 months 0 · prior 12 0
Gas, mcf lease total
Last 12 months 0 · prior 12 0
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Texaco E & P Inc.Jan 1993 → May 2002
- 2Chevron U. S. A. Inc.Jun 2002 → Mar 2022
- 3Continental Resources, Inc.Apr 2022 → May 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 291262-99 | Drill | Texaco Producing Inc. | Nov 21, 1985 | Nov 22, 1985 | — | 6,850 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-10-131944 | — | — | — | — |
| — | — G-10-157394 | — | — | — | — |
| — | — O-10-30033 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,796 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Lamar | 5,028 | -2,232 |
| Bell Canyon | 5,053 | -2,257 |
| Cherry Canyon | 5,953 | -3,157 |
| Cherry CanyonCHERRY CANYON-MONZ. | 6,173 | -3,377 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,044 | 6,290 | Perforated |
| 6,180 | 6,202 | Perforated |
| 6,243 | 6,436 | Perforated |
| 6,276 | 6,290 | Perforated |
| 6,427 | 6,436 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,325 | 11 | 1,000 S |
| 5.5 | 6,850 | 7.875 | 1,950 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 29, 2002 | Feb 22, 2001 | — |
| 00 | May 9, 1996 | Mar 1, 1996 | — |
| 00 | Mar 28, 1996 | — | — |
| 00 | Dec 18, 1995 | Nov 13, 1995 | — |
| 00 | Oct 26, 1989 | Sep 22, 1989 | — |
| 00 | Oct 4, 1989 | — | — |
| 00 | Mar 20, 1986 | Feb 26, 1986 | Yes |
| 00 | Mar 11, 1986 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-33703 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-33703 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47533703, documented in the API reference.