TEXAS · WELLS · WARD COUNTY · UNIVERSITY 7 LEASE · API 42-475-34217 · DISTRICT 7B
University 7 #2
Ward County · War-Wink (Cherry Canyon) field · Shut In · Vertical
- Fields on the latest permit · any of 2
- Block 18 (Cherry Canyon) · War-Wink (Cherry Canyon)
- Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.
University 7 #2 (API 42-475-34217) is a well in Ward County operated by TS Oil LLC, completed January 19, 2001 and listed as shut in on the RRC schedule, shut in October 1, 2024.
The RRC has issued one drilling permit (amended once), issued January 18, 1995, permitted to 7,248 ft.
It was permitted by IP Petroleum Company, Inc. and has since transferred to TS Oil LLC on the wellbore schedule.
Completion filings report 4 formation tops, including Delware Lime, Cherry Canyon, Base Manzanita, Brushey Canyon.
Its lease has reported 1.03M barrels of oil and 9.9M mcf of gas since March 1995, last reporting volume in November 2025. The lease carries 9 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by IP Petroleum Company, Inc.; the EWA schedule now lists a different operator.
- Based in
- River Oaks, TX
- P-5 status
- Active (A)
- P-5 last filed
- Mar 9, 2026
- Permits on file
- 1
- Phone
- (817) 928-5915
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | TS Oil LLC |
| Production reports | TS Oil, LLCthrough Nov 2025 |
| Latest permit | IP Petroleum Company, Inc.Jan 18, 1995 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 7,248
- total depth, ft
- 2
- permits on file
- Jan 18, 1995
- last permit issued
- Jan 19, 2001
- completed
- 1.03M
- cumulative oil, bbl
- 9.9M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · MAR 1995 THROUGH NOV 2025
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jan 19, 2001
- Shut in
- Oct 1, 2024
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 9 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| University 7 O-10-34430 | War-Wink (Cherry Canyon) | TS Oil, LLC | 9 | 1.03M | 9.9M | Mar 1995 – Nov 2025 |
Oil, barrels lease total
Last 12 months 0 · prior 12 1,076(-100%)
Gas, mcf lease total
Last 12 months 13 · prior 12 216(-94%)
Wells named University 7
TS Oil LLC's other wells filed under this lease name in Ward County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1IP Petroleum Company, Inc.Mar 1995 → Sep 1998
- 2Vista Resources, Inc. (A)Oct 1998 → Feb 2000
- 3Prize Operating CompanyMar 2000 → Mar 2002
- 4Gruy Petroleum Management Co.Apr 2002 → Apr 2006
- 5Cimarex Energy Co. of ColoradoMay 2006 → May 2019
- 6McDaniel Company, Inc., TheJun 2019 → Dec 2022
- 7Jetta Operating Company, Inc.Jan 2023 → Apr 2025
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 431749-98 | Drill | IP Petroleum Company, Inc. | Mar 17, 1995 | Jan 18, 1995 | Feb 4, 1995 | 7,500 |
| 431749-99 | Drill | IP Petroleum Company, Inc. | Jan 11, 1995 | Jan 18, 1995 | — | 7,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jan 19, 2001 | University 7 O-10-34430 | War-Wink (Cherry Canyon) | TS Oil LLC | Shut In · shut in Oct 1, 2024 | 7,248 |
Formation tops
As filed on W-2/G-1. Subsea from 2,758 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Delware Lime | 5,010 | -2,252 |
| Cherry Canyon | 5,875 | -3,117 |
| Base Manzanita | 6,123 | -3,365 |
| Cherry CanyonLOWER CHERRY CANYON | 6,855 | -4,097 |
| Brushey Canyon | 7,135 | -4,377 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,408 | 6,434 | Perforated |
| 6,448 | 6,460 | Perforated |
| 6,464 | 6,500 | Perforated |
| 6,532 | 6,546 | Perforated |
| 7,061 | 7,075 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 838 | 12.25 | 415 S |
| 5.5 | 7,248 | 7.875 | 635 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 23, 2001 | Feb 20, 2001 | — |
| 00 | Apr 10, 1995 | Mar 17, 1995 | Yes |
| 00 | Mar 27, 1995 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-34217 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-34217 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47534217, documented in the API reference.