TEXAS · WELLS · WARD COUNTY · UNIVERSITY 1018 -B- LEASE · API 42-475-34327 · DISTRICT 7B

University 1018 -B- #7

Shut in

Ward County · Block 18 (Cherry Canyon) field · Shut In  · Vertical

University 1018 -B- #7 (API 42-475-34327) is a well in Ward County operated by Continental Resources Inc., completed December 11, 1999 and listed as shut in on the RRC schedule, shut in May 1, 2020.

The RRC has issued one drilling permit, issued December 8, 1995, permitted to 7,340 ft.

It was permitted by Texaco E & P Inc. and has since transferred to Continental Resources Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Lamar, Cherry Canyon.

Its lease has reported 124K barrels of oil and 422K mcf of gas since January 1993, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Continental Resources Inc.

Permitted by Texaco E & P Inc.; the EWA schedule now lists a different operator.

Based in
Oklahoma City, OK
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
552
Phone
(405) 234-9000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleContinental Resources Inc.
Production reportsContinental Resources, Inc.through May 2023
Latest permitTexaco E & P Inc.Dec 8, 1995

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,340
total depth, ft
1
permits on file
Dec 8, 1995
last permit issued
Dec 11, 1999
completed
124K
cumulative oil, bbl
422K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 11, 1999
Shut in
May 1, 2020
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
University 1018 -B- O-10-30033Block 18 (Cherry Canyon)Continental Resources, Inc.4124K422KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 0 · prior 12 0

050100202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0510202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Texaco E & P Inc.Jan 1993 → May 2002
  2. 2Chevron U. S. A. Inc.Jun 2002 → Mar 2022
  3. 3Continental Resources, Inc.Apr 2022 → May 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
442458-99DrillTexaco E & P Inc.Dec 4, 1995Dec 8, 1995Feb 20, 19967,350

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 11, 1999University 1018 -B- O-10-30033Block 18 (Cherry Canyon)Continental Resources Inc.Shut In · shut in May 1, 20207,340

Formation tops

As filed on W-2/G-1. Subsea from 2,795 ft elevation.Download CSV →

FormationMD ftSubsea
LamarLAMAR LS5,035-2,240
Cherry Canyon6,185-3,390
Cherry CanyonCHERRY CANYON (BS)7,190-4,395

Perforations

Perforated and open-hole intervals.

FromToType
6,3866,386Perforated
6,4436,460Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62587211450 S
5.57,3407.8751,990 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 14, 2000Jan 6, 2000—
00Apr 24, 1996Apr 11, 1996Yes
00Apr 23, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47534327, documented in the API reference.