TEXAS · WELLS · WARD COUNTY · API 42-475-34342 · DISTRICT 7B

Caprito 98 #10

Plugged

Ward County · Abraxas (Cherry Canyon) field  · Vertical

Caprito 98 #10 (API 42-475-34342) is a plugged well in Ward County, plugged December 21, 2016, last operated by Abraxas Petroleum Corporation.

The RRC has issued 2 drilling permits in 1996, permitted to 7,200 ft.

Completion filings report 3 formation tops, including Delaware, Cherry Canyon, Brushy Canyon.

Its 2 leases have reported 638K barrels of oil and 5.66M mcf of gas since March 1996, last reporting in July 2026. The leases carry 20 wells, so these are lease totals, not this well alone.

Operator of record

Abraxas Petroleum Corporation

Based in
San Antonio, TX
P-5 status
Active (A)
P-5 last filed
Feb 13, 2026
Permits on file
582
Phone
(210) 757-9846

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAbraxas Petroleum Corporation
Production reportsAbraxas Petroleum Corporationthrough Aug 2024
Latest permitAbraxas Petroleum CorporationMay 31, 1996
7,200
total depth, ft
2
permits on file
May 31, 1996
last permit issued
May 25, 1996
completed
638K
cumulative oil, bbl
5.66M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 25, 1996
Shut in
—
Plugged
Dec 21, 2016

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 20 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Caprito 98 O-10-34903Abraxas (Cherry Canyon)Abraxas Petroleum Corporation17634K5.65MApr 1996 – Jul 2026
Caprito 98 O-10-34956Abraxas (Brushy Canyon)Abraxas Petroleum Corporation34.5K12.8KMar 1996 – Sep 2003

Oil, barrels lease total

Last 12 months 0 · prior 12 280(-100%)

0100200202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 341(-100%)

0100200300202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Abraxas Petroleum CorporationMar 1996 → Aug 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
448718-99RecompletionAbraxas Petroleum CorporationMay 30, 1996May 31, 1996Jun 1, 19967,200
444360-99DrillAbraxas Petroleum Corp.Feb 1, 1996Feb 13, 1996Feb 25, 19967,200

Completions

CompletedLeaseFieldOperatorStatusDepth
May 25, 1996Caprito 98 O-10-34903Abraxas (Cherry Canyon)Abraxas Petroleum CorporationPlugged—
Mar 24, 1996Caprito 98 O-10-34903Abraxas (Cherry Canyon)Abraxas Petroleum CorporationPlugged—
Mar 24, 1996Caprito 98 O-10-34956Abraxas (Brushy Canyon)Abraxas Petroleum CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,660 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware4,780-2,120
Cherry Canyon5,680-3,020
Brushy Canyon6,938-4,278

Perforations

Perforated and open-hole intervals.

FromToType
6,7496,766Perforated
6,7976,799Perforated
6,8086,813Perforated
6,8186,821Perforated
6,9426,952Perforated
6,9546,979Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.37522217.5300 S
8.6252,500111,200 S
5.57,0707.875725 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 23, 2003Apr 26, 1996Yes
00Aug 27, 1996Jun 20, 1996Yes
00Aug 5, 1996——
00Jul 19, 1996Apr 26, 1996Yes
00Jun 25, 1996——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47534342, documented in the API reference.