WELL · 42-475-34502 · DISTRICT 8
Caprito 99 #8
Ward County · Abraxas (Cherry Canyon) field · Vertical
Caprito 99 #8 (API 42-475-34502) is a plugged well in Ward County, plugged December 21, 2013, last operated by Abraxas Petroleum Corporation.
The RRC has issued one drilling permit, issued July 24, 1997, permitted to 7,700 ft.
Completion filings report 3 formation tops, including Bell Canyon, Cherry Canyon, Brushy Canyon.
Its lease has reported 49.7K barrels of oil and 289K mcf of gas since March 1996, last reporting in July 2026. The lease carries 10 wells, so these are lease totals, not this well alone.
Operator of record
- Based in
- San Antonio, TX
- P-5 status
- Active (A)
- P-5 last filed
- Feb 13, 2026
- Permits on file
- 582
- Phone
- (210) 757-9846
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Abraxas Petroleum Corporation |
| Production reports | Abraxas Petroleum Corporationthrough Aug 2015 |
| Latest permit | Abraxas Petroleum CorporationJul 24, 1997 |
- 7,700
- total depth, ft
- 1
- permits on file
- Jul 24, 1997
- last permit issued
- Oct 12, 1997
- completed
- 49.7K
- cumulative oil, bbl
- 289K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Mar 1996 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Oct 12, 1997
- Shut in
- —
- Plugged
- Dec 21, 2013
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 10 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Caprito 99 O-10-34904 | Abraxas (Cherry Canyon) | Abraxas Petroleum Corporation | 10 | 49.7K | 289K | Mar 1996 – Jul 2026 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Abraxas Petroleum CorporationMar 1996 → Aug 2015
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 465398-99 | Drill | Abraxas Petroleum Corporation | Jul 24, 1997 | Jul 24, 1997 | Aug 8, 1997 | 7,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Oct 12, 1997 | Caprito 99 O-10-34904 | Abraxas (Cherry Canyon) | Abraxas Petroleum Corporation | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,630 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell Canyon | 4,737 | -2,107 |
| Cherry Canyon | 5,580 | -2,950 |
| Brushy Canyon | 6,800 | -4,170 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 6,610 | 6,795 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 1,430 | 17.5 | 2,450 S |
| 8.625 | 4,030 | 11 | 750 S |
| 5.5 | 7,050 | 7.875 | 1,100 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 25, 1998 | Dec 4, 1997 | Yes |
| 00 | Mar 17, 1998 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-34502 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-34502 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47534502, documented in the API reference.