WELL · 42-475-34509 · DISTRICT 8

Caprito 83 #11

Plugged

Ward County · Abraxas (Cherry Canyon) field  · Vertical

Caprito 83 #11 (API 42-475-34509) is a plugged well in Ward County, plugged November 6, 2020, last operated by Abraxas Petroleum Corporation.

The RRC has issued one drilling permit, issued August 27, 1997, permitted to 7,700 ft.

Completion filings report 3 formation tops, including Bell Canyon, Cherry Canyon, Brushy Canyon.

Its 2 leases have reported 928K barrels of oil and 5.12M mcf of gas since July 1996, last reporting in July 2026. The leases carry 33 wells, so these are lease totals, not this well alone.

Operator of record

Abraxas Petroleum Corporation

Based in
San Antonio, TX
P-5 status
Active (A)
P-5 last filed
Feb 13, 2026
Permits on file
582
Phone
(210) 757-9846

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAbraxas Petroleum Corporation
Production reportsAbraxas Petroleum Corporationthrough Apr 2022
Latest permitAbraxas Petroleum CorporationAug 27, 1997
7,700
total depth, ft
1
permits on file
Aug 27, 1997
last permit issued
Feb 11, 2000
completed
928K
cumulative oil, bbl
5.12M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 1996 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 11, 2000
Shut in
—
Plugged
Nov 6, 2020

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 33 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Caprito 83 O-10-35061Abraxas (Cherry Canyon)Abraxas Petroleum Corporation20533K3.35MJul 1996 – Jul 2026
Caprito 83 O-10-35180Abraxas (Bell Canyon)Abraxas Petroleum Corporation13395K1.77MOct 1996 – Oct 2003

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Abraxas Petroleum CorporationJul 1996 → Apr 2022

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
466766-99DrillAbraxas Petroleum CorporationAug 26, 1997Aug 27, 1997Sep 1, 19977,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 11, 2000Caprito 83 O-10-35061Abraxas (Cherry Canyon)Abraxas Petroleum CorporationPlugged—
Feb 11, 2000Caprito 83 O-10-35180Abraxas (Bell Canyon)Abraxas Petroleum CorporationPlugged—
Nov 22, 1997Caprito 83 O-10-35061Abraxas (Cherry Canyon)Abraxas Petroleum CorporationPlugged—
Nov 22, 1997Caprito 83 O-10-35180Abraxas (Bell Canyon)Abraxas Petroleum CorporationPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,675 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon4,762-2,087
Cherry Canyon5,657-2,982
Brushy Canyon6,800-4,125

Perforations

Perforated and open-hole intervals.

FromToType
4,7644,790Perforated
6,3376,792Perforated
6,3376,794Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,42017.52,800 S
8.6254,03511610 S
5.57,0507.875850 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 23, 2003Mar 9, 2000—
00Jun 15, 2000Mar 9, 2000—
00May 31, 2000Jan 20, 1998Yes
00Sep 22, 1998Jan 20, 1998Yes
00Sep 16, 1998Jan 20, 1998Yes
00Sep 4, 1998——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47534509, documented in the API reference.