WELL · 42-475-34643 · DISTRICT 8

Winter 14-20 #1

Y

Ward County · Crawar (Glorieta) field · Injection  · Vertical

Winter 14-20 #1 (API 42-475-34643) is a well in Ward County operated by Hilcorp Energy Company, completed January 2, 2023 and listed as injection on the RRC schedule.

The RRC has issued one drilling permit, issued June 7, 2000, permitted to 7,200 ft.

It was permitted by Amtex Energy, Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 4 formation tops, including Yates, Grayburg, Glorieta, Devonian.

Its lease has reported 248 barrels of oil since December 2000, last reporting in July 2026.

It holds an active disposal or injection permit, with 107K barrels injected in the 12 months reported through June 2025.

Operator of record

Hilcorp Energy Company

Permitted by Amtex Energy, Inc.; the EWA schedule now lists a different operator.

Houston, TX · P-5 Y, filed Mar 26, 2026 · 3,453 permits on file · (713) 209-2411

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsPogo Producing Companythrough Mar 2001
Latest permitAmtex Energy, Inc.Jun 7, 2000

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,200
total depth, ft
1
permits on file
Jun 7, 2000
last permit issued
Jan 2, 2023
completed
248
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2000 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jan 2, 2023
Shut in
—
Plugged
—

Operator's P-5 on the schedule: X

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Winter 14-20 O-10-36569Crawar (Glorieta)Hilcorp Energy Company12480Dec 2000 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pogo Producing CompanyDec 2000 → Mar 2001

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
495827-99DrillAmtex Energy, Inc.Jun 5, 2000Jun 7, 2000Jul 1, 20007,200

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-36569————

Formation tops

As filed on W-2/G-1. Download CSV →

FormationMD ft
Yates1,840
Grayburg2,665
Glorieta4,020
Devonian6,387

Perforations

Perforated and open-hole intervals.

FromToType
4,1064,322Perforated
5,2905,325Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62560011205 S
5.56,5997.875800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 5, 2024Nov 16, 2023—
00Apr 27, 2015Apr 15, 2015—
00Jun 6, 2001Jan 29, 2001Yes
00Mar 27, 2001——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

107K
bbl, last 12 reported months
1.56M
bbl, all reported
Jun 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000091186H-1 InjectionActive5,0002,5105,020–6,543

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 106,702 · prior 12 103,510(+3%)

05K10K15K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47534643, documented in the API reference.