WELL · 42-475-34723 · DISTRICT 8

Tunstill #1

Plugged

Ward County · Sand Hills West (Devonian) field  · Horizontal

Tunstill #1 (API 42-475-34723) is a plugged horizontal well in Ward County, plugged June 12, 2023, last operated by Blackbeard Operating LLC.

The RRC has issued one drilling permit, issued June 27, 2001, permitted to 7,600 ft.

It was permitted by Pogo Producing CO. and has since transferred to Blackbeard Operating LLC on the wellbore schedule.

Completion filings report 5 formation tops, including Rustler, Yates, Tubb, Wichita-Albany.

Operator of record

Blackbeard Operating LLC

Permitted by Pogo Producing Co.; the EWA schedule now lists a different operator.

Fort Worth, TX · P-5 Y, filed Jul 4, 2026 · 2,263 permits on file · (432) 242-0050

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleBlackbeard Operating LLC
Production reportsOXY USA Inc.through Sep 2010
Latest permitPogo Producing Co.Jun 27, 2001

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,600
total depth, ft
1
permits on file
Jun 27, 2001
last permit issued
Apr 9, 2012
completed
0
cumulative oil, bbl
110K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2002 THROUGH Aug 2023

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Apr 9, 2012
Shut in
—
Plugged
Jun 12, 2023

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Tunstill G-10-195330Sand Hills, West (Devonian)Blackbeard Operating, LLC10110KApr 2002 – Aug 2023

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Pogo Producing CompanyApr 2002 → Jan 2008
  2. 2Pogo Producing Company LLCFeb 2008 → Feb 2008
  3. 3OXY USA Inc.Mar 2008 → Sep 2010

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
510693-99DrillPogo Producing Co.Jun 25, 2001Jun 27, 2001Mar 19, 20027,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-10-195330————

Formation tops

As filed on W-2/G-1. Subsea from 2,560 ft elevation.Download CSV →

FormationMD ftSubsea
Rustler5562,004
Yates1,950610
Tubb4,938-2,378
Wichita-AlbanyWICHITA ALBANY5,510-2,950
Devonian6,532-3,972

Perforations

Perforated and open-hole intervals.

FromToType
5,0805,460Perforated
6,8157,575Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62583212.25625 S
5.56,8157.875700 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 16, 2012May 3, 2012—
00Jul 24, 2003May 28, 2002Yes
00Jul 10, 2003——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
2.79M
bbl, all reported
Feb 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104704W-14 DisposalPlugged Sep 6, 202315,0002,4004,938–6,630

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 0

0120222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47534723, documented in the API reference.