TEXAS · WELLS · WARD COUNTY · HUTCHINGS STOCK ASSN. LEASE · API 42-475-34896 · DISTRICT 7B

Hutchings Stock Assn. #3000

Y

Ward County · H. S. A. (San Andres) field · Injection  · Vertical

Hutchings Stock Assn. #3000 (API 42-475-34896) is a well in Ward County operated by Sundown Energy LP, completed February 8, 2012 and listed as injection on the RRC schedule.

The RRC has issued 2 drilling permits between 2005 and 2011, permitted to 4,950 ft.

Completion filings report 2 formation tops, including San Andres, Holt.

Its lease has reported 3.06M barrels of oil and 491K mcf of gas since January 1993, last reporting in July 2026. The lease carries 51 wells, so these are lease totals, not this well alone.

It holds an active disposal or injection permit, with 127K barrels injected in the 12 months reported through July 2025.

Operator of record

Sundown Energy LP

Based in
Dallas, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 3, 2026
Permits on file
300
Phone
(214) 368-6100

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulenone
Production reportsSundown Energy LPthrough Mar 2026
Latest permitSundown Energy LPOct 6, 2011
4,950
total depth, ft
2
permits on file
Oct 6, 2011
last permit issued
Feb 8, 2012
completed
3.06M
cumulative oil, bbl
491K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Feb 8, 2012
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 51 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hutchings Stock Assn. O-10-25599H. S. A. (San Andres)Sundown Energy LP513.06M491KJan 1993 – Jul 2026

Oil, barrels lease total

Last 12 months 27,384 · prior 12 24,294(+13%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 4,974 · prior 12 7,135(-30%)

05001K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chevron U. S. A. Inc.Jan 1993 → Jul 2000
  2. 2Sundown Energy, Inc.Aug 2000 → Jan 2005
  3. 3Sundown Energy LPFeb 2005 → Mar 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
725676-99RecompletionSundown Energy LPOct 4, 2011Oct 6, 2011Jan 19, 20125,000
560734-99DrillSundown Energy LPApr 19, 2005Apr 19, 2005Jul 25, 20054,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Feb 8, 2012Hutchings Stock Assn. O-10-25599H. S. A. (San Andres)Sundown Energy LPInjection4,950

Formation tops

As filed on W-2/G-1. Subsea from 2,703 ft elevation.Download CSV →

FormationMD ftSubsea
San Andres3,740-1,037
Holt4,050-1,347

Perforations

Perforated and open-hole intervals.

FromToType
3,7403,911Perforated
4,0504,950Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62569512.25370 S
5.54,0507.875825 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 12, 2014Feb 21, 2012—
00Apr 20, 2007Sep 22, 2005—
00Jan 23, 2007—Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

127K
bbl, last 12 reported months
3.82M
bbl, all reported
Jul 2025
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104261H-1 InjectionActive3,5001,8703,740–5,000

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 127,407 · prior 12 198,119(-36%)

020K40K20242025

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47534896, documented in the API reference.