WELL · 42-475-35332 · DISTRICT 8
Sealy-Smith #1
Ward County · Wagon Wheel (Penn) field · Vertical
Sealy-Smith #1 (API 42-475-35332) is a well in Ward County operated by Breck Operating Corp., completed November 24, 2008.
The RRC has issued 4 drilling permits (amended once) between 2008 and 2015, permitted to 9,300 ft.
It was permitted by Eland Energy, Inc. and has since transferred to Breck Operating Corp. on the wellbore schedule.
Completion filings report 8 formation tops, including Yates, Seven Rivers, Queen, San Andres.
Its 3 leases have reported 2.39K barrels of oil since August 2008, last reporting in July 2026. The leases carry 3 wells, so these are lease totals, not this well alone.
It holds an active disposal or injection permit.
Operator of record
Permitted by Eland Energy, Inc.; the EWA schedule now lists a different operator.
Breckenridge, TX · P-5 Y, filed Mar 8, 2019 · 295 permits on file · (254) 559-0881
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Breck Operating Corp. |
| Production reports | Eland Energy, Inc.through Jun 2014 |
| Latest permit | Eland Energy, Inc.Dec 1, 2015 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 9,300
- total depth, ft
- 5
- permits on file
- Dec 1, 2015
- last permit issued
- Nov 24, 2008
- completed
- 2.39K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Aug 2008 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Nov 24, 2008
- Shut in
- —
- Plugged
- —
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Sealy-Smith O-10-39761 | Monahans (Queen Sand) | Sundown Energy LP | 1 | 0 | 0 | May 2009 – Jul 2026 |
| Sealy-Smith O-10-44703 | Monahans (Clear Fork) | Eland Energy, Inc. | 1 | 2.21K | 0 | Oct 2013 – May 2016 |
| Sealy-Smith O-10-39066 | Wagon Wheel (Penn) | Breck Operating Corp. | 1 | 178 | 0 | Aug 2008 – Mar 2011 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Breck Operating Corp.Aug 2008 → Jan 2009
- 2Sundown Energy LPOct 2013 → Oct 2013
- 3Eland Energy, Inc.Nov 2013 → Jun 2014
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 812164-99 | Recompletion | Eland Energy, Inc. | Nov 20, 2015 | Dec 1, 2015 | Mar 23, 2008 | 9,163 |
| 758321-98 | Recompletion | Eland Energy, Inc. | Mar 27, 2013 | Apr 5, 2013 | Mar 2, 2013 | 9,153 |
| 758321-99 | Recompletion | Eland Energy, Inc. | Mar 11, 2013 | Mar 19, 2013 | — | 3,500 |
| 679465-99 | Recompletion | Breck Operating Corp. | Mar 13, 2009 | Mar 16, 2009 | Mar 30, 2009 | 3,500 |
| 653242-99 | Drill | Breck Operating Corp. | Jan 15, 2008 | Jan 24, 2008 | Mar 23, 2008 | 9,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-39066 | — | — | — | — |
| — | — O-10-39761 | — | — | — | — |
| — | — O-10-44703 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,641 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yates | 2,476 | 165 |
| Seven Rivers | 2,727 | -86 |
| QueenQUEEN SAND | 3,100 | -459 |
| Queen | 3,129 | -488 |
| San Andres | 3,630 | -989 |
| Glorieta | 4,885 | -2,244 |
| Clear Fork | 4,942 | -2,301 |
| Clear ForkCLEARFORK | 5,156 | -2,515 |
| Wichita-Albany | 6,973 | -4,332 |
| PennsylvanianPENN | 8,129 | -5,488 |
| Pennsylvanian | 8,284 | -5,643 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,135 | 3,144 | Perforated |
| 3,136 | 3,142 | Perforated |
| 3,195 | 3,204 | Perforated |
| 4,942 | 4,994 | Perforated |
| 5,040 | 5,060 | Perforated |
| 5,090 | 5,120 | Perforated |
| 5,156 | 5,200 | Perforated |
| 8,466 | 8,478 | Perforated |
| 8,547 | 8,551 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 13.375 | 526 | 17.5 | 535 S |
| 8.625 | 3,542 | 12.25 | 2,200 S |
| 5.5 | 9,163 | 7.875 | 925 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 27, 2023 | Oct 20, 2022 | — |
| 00 | May 16, 2016 | Dec 14, 2015 | — |
| 00 | Nov 17, 2015 | Oct 4, 2015 | — |
| 00 | May 26, 2010 | Dec 7, 2009 | Yes |
| 00 | Mar 17, 2010 | Dec 4, 2008 | Yes |
| 00 | Feb 19, 2009 | Dec 4, 2008 | Yes |
| 00 | Jan 29, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-35332 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-35332 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.34M
- bbl, all reported
- Jul 2025
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000112791 | H-1 Injection | Active | 5,000 | 1,500 | 3,129–3,370 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47535332, documented in the API reference.