WELL · 42-475-35361 · DISTRICT 8

Fields 33-25 #1H

Y

Ward County · Phantom (Wolfcamp) field · Shut IN  · Horizontal

Fields 33-25 #1H (API 42-475-35361) is a horizontal well in Ward County operated by Apache Corporation, completed September 16, 2010 and listed as shut in on the RRC schedule.

The RRC has issued 2 drilling permits (amended twice) between 2008 and 2011, permitted to 11,600 ft.

It was permitted by Cimarex Energy CO. and has since transferred to Apache Corporation on the wellbore schedule.

Completion filings report 4 formation tops, including Cherry Canyon, Bone Spring, Phantom (Wolfcamp), Wolfcamp.

Its lease has reported 333K barrels of oil and 469K mcf of gas since August 2008, last reporting in July 2026.

Operator of record

Apache Corporation

Permitted by Cimarex Energy Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,756
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsCallon Petroleum Operating Cothrough Mar 2023
Latest permitCimarex Energy Co.Dec 12, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,600
total depth, ft
4
permits on file
Dec 12, 2011
last permit issued
Sep 16, 2010
completed
333K
cumulative oil, bbl
469K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 16, 2010
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Fields 33-25 O-10-39205Phantom (Wolfcamp)Apache Corporation1333K469KAug 2008 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cimarex Energy Co. of ColoradoAug 2008 → Mar 2009
  2. 2Cimarex Energy Co.Apr 2009 → Aug 2018
  3. 3Callon Petroleum Operating CoSep 2018 → Mar 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
729616-98RecompletionCimarex Energy Co.Mar 28, 2012Dec 12, 2011Jul 8, 201011,600
729616-99RecompletionCimarex Energy Co.Dec 7, 2011Dec 12, 2011—11,600
658562-98DrillCimarex Energy Co. of ColoradoAug 4, 2008Apr 15, 2008Apr 24, 200811,600
658562-99DrillCimarex Energy Co.Apr 1, 2008Apr 15, 2008Apr 24, 200811,600

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-39205————

Formation tops

As filed on W-2/G-1. Subsea from 2,588 ft elevation.Download CSV →

FormationMD ftSubsea
Cherry Canyon5,970-3,382
Bone Spring8,186-5,598
Phantom (Wolfcamp)10,500-7,912
Bone Spring3RD BONE SPRING SHALE10,760-8,172
Wolfcamp11,047-8,459

Perforations

Perforated and open-hole intervals.

FromToType
11,04713,213Perforated
11,77715,350Perforated
13,21315,279Open hole
15,35015,831Open hole

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,19717.51,085 S
9.6255,07012.251,675 S
711,2908.75980 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Dec 14, 2012Jan 11, 2012Yes
00May 15, 2009Jan 9, 2009Yes
00Apr 8, 2009——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47535361, documented in the API reference.