WELL · 42-475-35459 · DISTRICT 8
Edwards 27 #3
Ward County · Crawar (Glorieta) field · Producing · Vertical
Edwards 27 #3 (API 42-475-35459) is a well in Ward County operated by Williams Oil Company, completed April 15, 2009 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued September 25, 2008, permitted to 6,500 ft.
Completion filings report 7 formation tops, including Judkins, Glorieta, Clear Fork, Tubb.
Its lease has reported 46.2K barrels of oil and 404K mcf of gas since April 2009, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Active, filed Jan 12, 2026 · 177 permits on file · (432) 682-0363
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Williams Oil Company |
| Production reports | Williams Oil Companythrough Apr 2026 |
| Latest permit | Williams Oil CompanySep 25, 2008 |
- 6,500
- total depth, ft
- 1
- permits on file
- Sep 25, 2008
- last permit issued
- Apr 15, 2009
- completed
- 46.2K
- cumulative oil, bbl
- 404K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Apr 2009 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Apr 15, 2009
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Edwards 27 O-10-39416 | Crawar (Glorieta) | Williams Oil Company | 2 | 46.2K | 404K | Apr 2009 – Jul 2026 |
Gas, mcf lease total
Last 12 months 6,998 · prior 12 9,541(-27%)
Oil, barrels lease total
Last 12 months 933 · prior 12 742(+26%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Williams Oil CompanyApr 2009 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 670660-99 | Drill | Williams Oil Company | Sep 6, 2008 | Sep 25, 2008 | Sep 26, 2008 | 6,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-39416 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,602 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Judkins | 3,420 | -818 |
| Glorieta | 4,320 | -1,718 |
| Clear ForkCLEARFORK | 4,660 | -2,058 |
| Tubb | 4,870 | -2,268 |
| Wichita-AlbanyWICHITA ALBANY | 5,396 | -2,794 |
| Wolfcamp | 6,234 | -3,632 |
| Devonian | 6,446 | -3,844 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 4,324 | 4,334 | Perforated |
| 4,366 | 4,472 | Perforated |
| 4,406 | 4,417 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 502 | 11 | 200 S |
| 5.5 | 6,522 | 7.875 | 525 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Sep 10, 2009 | Apr 29, 2009 | Yes |
| 00 | Aug 5, 2009 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-35459 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-35459 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47535459, documented in the API reference.