TEXAS · WELLS · WARD COUNTY · API 42-475-35521 · DISTRICT 7B

Monroe 34-180 #1H

Plugged

Ward County · Sandbar (Bone Spring) field  · Horizontal

Monroe 34-180 #1H (API 42-475-35521) is a plugged horizontal well in Ward County, plugged March 7, 2025, last operated by Anadarko E&P Onshore LLC.

The RRC has issued 2 drilling permits between 2009 and 2017, permitted to 16,000 ft.

Completion filings report 4 formation tops, including Bell Canyon, Cherry Canyon, Brushy Canyon, Bone Spring.

Its 2 leases have reported 290K barrels of oil and 615K mcf of gas since March 2010, last reporting in July 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Anadarko E&P Onshore LLC

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Onshore LLC
Production reportsAnadarko E&P Onshore LLCthrough Jul 2024
Latest permitAnadarko E&P Onshore LLCJan 27, 2017
16,000
total depth, ft
2
permits on file
Jan 27, 2017
last permit issued
Mar 21, 2010
completed
290K
cumulative oil, bbl
615K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 21, 2010
Shut in
—
Plugged
Mar 7, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Monroe 34-180 O-10-48201Sandbar (Bone Spring)Anadarko E&P Onshore LLC1122K188KNov 2016 – Jul 2026
Monroe 34-180 O-10-39877Phantom (Wolfcamp)Anadarko E&P Onshore LLC1168K428KMar 2010 – Mar 2017

Oil, barrels lease total

Last 12 months 0 · prior 12 4(-100%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 0 · prior 12 173(-100%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko Petroleum CorporationMar 2010 → Mar 2013
  2. 2Anadarko E&P Onshore LLCApr 2013 → Jun 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
822278-99Field transferAnadarko E&P Onshore LLCJan 19, 2017Jan 27, 2017Jan 6, 201016,000
688531-99DrillAnadarko Petroleum CorporationDec 10, 2009Dec 17, 2009Jan 6, 201016,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 21, 2010Monroe 34-180 O-10-48201Sandbar (Bone Spring)Anadarko E&P Onshore LLCPlugged—
Mar 21, 2010Monroe 34-180 O-10-39877Phantom (Wolfcamp)Anadarko E&P Onshore LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,634 ft elevation.Download CSV →

FormationMD ftSubsea
Bell Canyon4,954-2,320
Cherry Canyon5,914-3,280
Brushy Canyon7,089-4,455
Bone SpringBONE SPRING 19,264-6,630
Bone SpringBONE SPRING 29,860-7,226
Bone SpringBONE SPRING 310,614-7,980

Perforations

Perforated and open-hole intervals.

FromToType
10,93410,942Perforated
10,93414,730Perforated
11,32011,328Perforated
12,01012,018Perforated
12,68012,688Perforated
13,38013,388Perforated
14,06014,068Perforated
14,72014,730Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,00012.251,831 S
711,2568.75626 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 7, 2017Feb 1, 2017Yes
00Jun 1, 2010Apr 15, 2010Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47535521, documented in the API reference.