WELL · 42-475-35628 · DISTRICT 8
Monroe 1-10 #1H
Ward County · Phantom (Wolfcamp) field · Producing · Horizontal
Monroe 1-10 #1H (API 42-475-35628) is a horizontal well in Ward County operated by Mcm Operating LLC, completed June 8, 2011 and listed as producing on the RRC schedule, shut in October 1, 2026.
The RRC has issued 2 drilling permits between 2010 and 2015, permitted to 11,234 ft.
It was permitted by Shell Western E&P and has since transferred to Mcm Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Delaware, Cherry Cany9on, Bone Spring.
Its 3 leases have reported 1.35M barrels of oil and 2.15M mcf of gas since June 2011, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Shell Western E&P; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 20, 2025
- Permits on file
- 64
- Phone
- (432) 685-1790
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Pdeh LLC |
| Production reports | Pdeh LLCthrough Apr 2026 |
| Latest permit | Shell Western E&PJun 26, 2015 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,234
- total depth, ft
- 2
- permits on file
- Jun 26, 2015
- last permit issued
- Jun 8, 2011
- completed
- 1.35M
- cumulative oil, bbl
- 2.15M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jun 2011 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Jun 8, 2011
- Shut in
- Oct 1, 2026
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Monroe 1-10 O-10-46332 | Phantom (Wolfcamp) | Pdeh LLC | 3 | 569K | 882K | Apr 2013 – Jul 2026 |
| Monroe 1-10 O-10-50079 | Phantom (Wolfcamp) | MCM Operating, LLC | 2 | 467K | 806K | Apr 2018 – Jul 2026 |
| Monroe 1-10 O-10-42119 | Phantom (Bone Springs) | Shell Western E&P | 1 | 314K | 465K | Jun 2011 – Jul 2016 |
Oil, barrels lease total
Last 12 months 40,062 · prior 12 57,946(-31%)
Gas, mcf lease total
Last 12 months 48,192 · prior 12 82,105(-41%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chesapeake Operating, Inc.Jun 2011 → Sep 2012
- 2Shell Western E&POct 2012 → Aug 2021
- 3Halcon Operating Co., Inc.Apr 2018 → Nov 2025
- 4Pdeh LLCSep 2021 → Apr 2026
- 5MCM Operating, LLCDec 2025 → Feb 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 807850-99 | Field transfer | Shell Western E&P | Jun 26, 2015 | Jun 26, 2015 | Oct 31, 2010 | 18,000 |
| 703197-99 | Drill | Chesapeake Operating, Inc. | Oct 4, 2010 | Oct 6, 2010 | Oct 28, 2010 | 18,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Jun 8, 2011 | Monroe 1-10 O-10-50079 | Phantom (Wolfcamp) | MCM Operating LLC | Producing · shut in Oct 1, 2026 | 11,234 |
| Jun 8, 2011 | Monroe 1-10 O-10-46332 | Phantom (Wolfcamp) | Permian Resources Operating LLC | Not on Schedule | — |
| Jun 8, 2011 | Monroe 1-10 O-10-46332 | Phantom (Wolfcamp) | Permian Resources Operating LLC | Not on Schedule | — |
| Jun 8, 2011 | Monroe 1-10 O-10-42119 | Phantom (Bone Springs) | Shell Western E&P | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,707 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Delaware | 4,984 | -2,277 |
| Cherry CANY9ON | 5,962 | -3,255 |
| Bone Spring | 8,381 | -5,674 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,643 | 14,865 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 12.25 | 4,960 | 9.625 | 1,380 S |
| 9.625 | 4,960 | 12.25 | 1,380 S |
| 8.75 | 11,171 | 7 | 775 S |
| 7 | 11,171 | 8.75 | 775 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jul 12, 2018 | Apr 1, 2015 | — |
| 00 | Jul 10, 2015 | Apr 1, 2015 | — |
| 00 | Jun 26, 2015 | Jul 13, 2011 | Yes |
| 00 | Jan 9, 2013 | Jul 13, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-35628 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-35628 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47535628, documented in the API reference.