TEXAS · WELLS · WARD COUNTY · MONROE 34-205 LEASE · API 42-475-35674 · DISTRICT 7B
Monroe 34-205 #1H
Ward County · Phantom (Wolfcamp) field · Horizontal
Monroe 34-205 #1H (API 42-475-35674) is a plugged horizontal well in Ward County, plugged August 9, 2017, last operated by Shell Western E&P.
The RRC has issued one drilling permit, issued January 11, 2011, permitted to 18,000 ft.
It was permitted by Chesapeake Operating, Inc. and has since transferred to Shell Western E&P on the wellbore schedule.
Completion filings report 3 formation tops, including Bell Canyon, Cherry Canyon, Bone Spring.
Its lease has reported 37.5K barrels of oil and 442K mcf of gas since May 2011, last reporting in December 2021.
Operator of record
Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Delinquent (D)
- P-5 last filed
- Jan 4, 2021
- Permits on file
- 1,756
- Phone
- (832) 337-0694
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Shell Western E&P |
| Production reports | Shell Western E&Pthrough Jan 2016 |
| Latest permit | Chesapeake Operating, Inc.Jan 11, 2011 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 18,000
- total depth, ft
- 1
- permits on file
- Jan 11, 2011
- last permit issued
- May 16, 2011
- completed
- 37.5K
- cumulative oil, bbl
- 442K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · May 2011 THROUGH Dec 2021
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- May 16, 2011
- Shut in
- —
- Plugged
- Aug 9, 2017
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Monroe 34-205 O-10-42118 | Phantom (Wolfcamp) | Shell Western E&P | 1 | 37.5K | 442K | May 2011 – Dec 2021 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Chesapeake Operating, Inc.May 2011 → Sep 2012
- 2Shell Western E&POct 2012 → Jan 2016
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 708137-99 | Drill | Chesapeake Operating, Inc. | Jan 7, 2011 | Jan 11, 2011 | Jan 25, 2011 | 18,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| May 16, 2011 | Monroe 34-205 O-10-42118 | Phantom (Wolfcamp) | Shell Western E&P | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,614 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bell Canyon | 4,759 | -2,145 |
| Cherry Canyon | 5,720 | -3,106 |
| Bone Spring | 9,892 | -7,278 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 10,823 | 14,851 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 4,647 | 12.25 | 3,000 S |
| 7 | 10,906 | 8.75 | 775 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 9, 2013 | Jun 15, 2011 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-35674 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-35674 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47535674, documented in the API reference.