TEXAS · WELLS · WARD COUNTY · API 42-475-35718 · DISTRICT 7B

East Vermejo 33-66 #2H

Y

Ward County · Sandbar (Bone Spring) field · Producing  · Horizontal

East Vermejo 33-66 #2H (API 42-475-35718) is a horizontal well in Ward County operated by Anadarko E&P Onshore LLC, completed July 1, 2011 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 2011 and 2017, permitted to 10,866 ft.

Completion filings report one formation top, including Bone Spring.

Its 2 leases have reported 1.42M barrels of oil and 2.92M mcf of gas since May 2011, last reporting in July 2026. The leases carry 6 wells, so these are lease totals, not this well alone.

Operator of record

Anadarko E&P Onshore LLC

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleAnadarko E&P Onshore LLC
Production reportsAnadarko E&P Onshore LLCthrough Apr 2026
Latest permitAnadarko E&P Onshore LLCApr 28, 2017
10,866
total depth, ft
2
permits on file
Apr 28, 2017
last permit issued
Jul 1, 2011
completed
1.42M
cumulative oil, bbl
2.92M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Jul 1, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
East Vermejo 33-66 O-10-41507Phantom (Wolfcamp)Anadarko E&P Onshore LLC41.24M2.51MMay 2011 – Jul 2026
East Vermejo 33-66 O-10-48462Sandbar (Bone Spring)Anadarko E&P Onshore LLC2182K405KNov 2016 – Jul 2026

Oil, barrels lease total

Last 12 months 15,435 · prior 12 48,304(-68%)

05K10K202420252026

Gas, mcf lease total

Last 12 months 26,909 · prior 12 56,128(-52%)

05K10K15K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Anadarko Petroleum CorporationMay 2011 → Mar 2013
  2. 2Anadarko E&P Onshore LLCApr 2013 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
825570-99Field transferAnadarko E&P Onshore LLCApr 18, 2017Apr 28, 2017May 3, 201116,000
710814-99DrillAnadarko Petroleum CorporationFeb 23, 2011Mar 3, 2011May 1, 201116,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 1, 2011East Vermejo 33-66 O-10-48462Sandbar (Bone Spring)Anadarko E&P Onshore LLCProducing10,866
Jul 1, 2011East Vermejo 33-66 O-10-41507Phantom (Wolfcamp)Anadarko E&P Onshore LLCNot on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,669 ft elevation.Download CSV →

FormationMD ftSubsea
Bone SpringBONE SPRING 19,055-6,386
Bone SpringBONE SPRING 29,650-6,981
Bone SpringBONE SPRING 310,568-7,899

Perforations

Perforated and open-hole intervals.

FromToType
11,37015,602Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,00817.51,115 S
9.6254,67012.251,244 S
711,2858.75671 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00May 31, 2017May 3, 2017—
00Aug 5, 2014Feb 24, 2014—
00Aug 17, 2012Aug 26, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47535718, documented in the API reference.