TEXAS · WELLS · WARD COUNTY · MAGIC MAN 33-64 WRD LEASE · API 42-475-35794 · DISTRICT 7B

Magic Man 33-64 WRD #1H

Y

Ward County · Phantom (Wolfcamp) field · Producing  · Horizontal

Magic Man 33-64 Wrd #1H (API 42-475-35794) is a horizontal well in Ward County operated by Anadarko E&P Onshore LLC, completed August 23, 2011 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued April 29, 2011, permitted to 10,791 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Anadarko E&P Onshore LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Delaware, Bone Spring.

Its lease has reported 903K barrels of oil and 1.94M mcf of gas since August 2011, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

Anadarko E&P Onshore LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePdeh LLC
Production reportsPdeh LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.Apr 29, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,791
total depth, ft
1
permits on file
Apr 29, 2011
last permit issued
Aug 23, 2011
completed
903K
cumulative oil, bbl
1.94M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Aug 23, 2011
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Magic Man 33-64 WRD O-10-42019Phantom (Wolfcamp)Pdeh LLC6903K1.94MAug 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 5,112 · prior 12 6,772(-25%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 10,488 · prior 12 14,722(-29%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Aug 2011 → Sep 2012
  2. 2Shell Western E&POct 2012 → Aug 2021
  3. 3Pdeh LLCSep 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
714929-99DrillChesapeake Operating, Inc.Apr 25, 2011Apr 29, 2011May 13, 201112,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Aug 23, 2011Magic Man 33-64 WRD O-10-42019Phantom (Wolfcamp)Anadarko E&P Onshore LLCProducing10,791

Formation tops

As filed on W-2/G-1. Subsea from 2,464 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware4,624-2,160
Bone Spring8,069-5,605
Bone SpringBONE SPRING LIME8,361-5,897

Perforations

Perforated and open-hole intervals.

FromToType
11,34616,153Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,59512.251,615 S
711,3018.75775 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 30, 2012Oct 6, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47535794, documented in the API reference.