TEXAS · WELLS · WARD COUNTY · API 42-475-35809 · DISTRICT 7B

Black Stone 34-216 #2H

Shut in

Ward County · Phantom (Wolfcamp) field · Producing  · Horizontal

Black Stone 34-216 #2H (API 42-475-35809) is a horizontal well in Ward County operated by Mcm Operating LLC, completed September 1, 2011 and listed as producing on the RRC schedule, shut in October 1, 2018.

The RRC has issued one drilling permit, issued May 19, 2011, permitted to 10,653 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Mcm Operating LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Delaware, Cherry Canyon, Bone Spring.

No lease production has been reported under this well’s leases.

Operator of record

MCM Operating LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Midland, TX
P-5 status
Active (A)
P-5 last filed
Nov 20, 2025
Permits on file
64
Phone
(432) 685-1790

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHalcon Operating Co. Inc.
Production reportsHalcon Operating Co., Inc.through Aug 2023
Latest permitChesapeake Operating, Inc.May 19, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,653
total depth, ft
1
permits on file
May 19, 2011
last permit issued
Sep 1, 2011
completed
0
cumulative oil, bbl
109K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 1, 2011
Shut in
Oct 1, 2018
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 3 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Black Stone 34-216 G-10-288160Phantom (Wolfcamp)MCM Operating, LLC10109KSep 2011 – Jul 2026
Black Stone 34-216 O-10-42043Phantom (Wolfcamp)Halcon Operating Co., Inc.20161Jul 2011 – May 2020

Gas, mcf lease total

Last 12 months 0 · prior 12 0

0100200202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Halcon Operating Co., Inc.Sep 2011 → Aug 2023

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
716590-99DrillChesapeake Operating, Inc.May 16, 2011May 19, 2011Jun 1, 201116,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 1, 2011Black Stone 34-216 G-10-288160Phantom (Wolfcamp)MCM Operating LLCProducing · shut in Oct 1, 201810,653
Sep 1, 2011Black Stone 34-216 O-10-42043Phantom (Wolfcamp)Halcon Operating Co. Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 2,573 ft elevation.Download CSV →

FormationMD ftSubsea
Delaware4,662-2,089
Cherry Canyon5,656-3,083
Bone Spring7,980-5,407

Perforations

Perforated and open-hole intervals.

FromToType
10,99515,063Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,65112.252,885 S
710,9858.75830 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 2, 2020Oct 25, 2019—
00Jun 10, 2013Oct 26, 2011Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47535809, documented in the API reference.