TEXAS · WELLS · WARD COUNTY · PITZER-JOHNSON UNIT LEASE · API 42-475-35947 · DISTRICT 7B

Pitzer-Johnson Unit #1H

Shut in

Ward County · Phantom (Wolfcamp) field · Shut In  · Horizontal

Pitzer-Johnson Unit #1H (API 42-475-35947) is a horizontal well in Ward County operated by Apache Corporation, completed May 15, 2012 and listed as shut in on the RRC schedule, shut in August 1, 2025.

The RRC has issued one drilling permit, issued December 9, 2011, permitted to 10,981 ft.

It was permitted by Cimarex Energy CO. and has since transferred to Apache Corporation on the wellbore schedule.

Completion filings report 3 formation tops, including Cherry Canyon, Brushy Canyon, Bone Spring.

Its lease has reported 257K barrels of oil and 283K mcf of gas since May 2012, last reporting in July 2026.

Operator of record

Apache Corporation

Permitted by Cimarex Energy Co.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Dec 3, 2025
Permits on file
9,757
Phone
(713) 954-5500

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleApache Corporation
Production reportsApache Corporationthrough Oct 2024
Latest permitCimarex Energy Co.Dec 9, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,981
total depth, ft
1
permits on file
Dec 9, 2011
last permit issued
May 15, 2012
completed
257K
cumulative oil, bbl
283K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · May 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 15, 2012
Shut in
Aug 1, 2025
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pitzer-Johnson Unit O-10-43156Phantom (Wolfcamp)Apache Corporation1257K283KMay 2012 – Jul 2026

Gas, mcf lease total

Last 12 months 0 · prior 12 1,130(-100%)

0200400202420252026

Oil, barrels lease total

Last 12 months 0 · prior 12 2(-100%)

050100202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Cimarex Energy Co.May 2012 → Aug 2018
  2. 2Callon Petroleum Operating CoSep 2018 → Dec 2023
  3. 3Apache CorporationOct 2024 → Oct 2024

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
729161-99DrillCimarex Energy Co.Nov 30, 2011Dec 9, 2011Feb 18, 201211,200

Completions

CompletedLeaseFieldOperatorStatusDepth
May 15, 2012Pitzer-Johnson Unit O-10-43156Phantom (Wolfcamp)Apache CorporationShut In · shut in Aug 1, 202510,981

Formation tops

As filed on W-2/G-1. Subsea from 2,595 ft elevation.Download CSV →

FormationMD ftSubsea
Cherry Canyon5,945-3,350
Brushy Canyon7,300-4,705
Bone Spring8,290-5,695

Perforations

Perforated and open-hole intervals.

FromToType
10,96014,610Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6255,02612.252,635 S
710,9918.75635 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 1, 2013Oct 25, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47535947, documented in the API reference.