TEXAS · WELLS · WARD COUNTY · CHRISTIAN '46' LEASE · API 42-475-35953 · DISTRICT 7B

Christian 46 #1

Shut in

Ward County · Collie (Delaware) field · Shut In  · Vertical

Christian 46 #1 (API 42-475-35953) is a well in Ward County operated by Jetta Operating Company Inc., completed March 12, 2012 and listed as shut in on the RRC schedule, shut in August 1, 2017.

The RRC has issued one drilling permit, issued December 9, 2011, permitted to 6,360 ft.

It was permitted by Oxy USA Inc. and has since transferred to Jetta Operating Company Inc. on the wellbore schedule.

Completion filings report 2 formation tops, including Lmar, Cherry Canyon.

Its lease has reported 3.9K barrels of oil and 46.3K mcf of gas since March 2012, with no volume in the three years through April 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Jetta Operating Company Inc.

Permitted by OXY USA Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
605
Phone
(817) 639-2332

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJetta Operating Company Inc.
Production reportsJetta Operating Company, Inc.through Apr 2017
Latest permitOXY USA Inc.Dec 9, 2011

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

6,360
total depth, ft
1
permits on file
Dec 9, 2011
last permit issued
Mar 12, 2012
completed
3.9K
cumulative oil, bbl
46.3K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jul 2012 THROUGH Apr 2017

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 12, 2012
Shut in
Aug 1, 2017
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Christian '46' O-10-43543Collie (Delaware)Jetta Operating Company, Inc.23.9K46.3KMar 2012 – Apr 2017

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1OXY USA Inc.Jul 2012 → Apr 2017

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
729468-99DrillOXY USA Inc.Dec 6, 2011Dec 9, 2011Jan 31, 20127,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 12, 2012Christian 46 O-10-43543Collie (Delaware)Jetta Operating Company Inc.Shut In · shut in Aug 1, 20176,360

Formation tops

As filed on W-2/G-1. Subsea from 2,571 ft elevation.Download CSV →

FormationMD ftSubsea
Lmar4,678-2,107
Cherry Canyon5,665-3,094

Perforations

Perforated and open-hole intervals.

FromToType
4,8926,170Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,43212.251,100 S
7.6254,5738.75700 S
5.56,3606.75310 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Jan 29, 2014Feb 4, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47535953, documented in the API reference.