WELL · 42-475-35973 · DISTRICT 8

Barstow 27 #4

N

Ward County · Scott (Cherry Canyon) field  · Vertical

Barstow 27 #4 (API 42-475-35973) is a well in Ward County operated by Jetta Operating Company Inc., completed August 12, 2012.

The RRC has issued one drilling permit, issued January 10, 2012, permitted to 6,800 ft.

Completion filings report 3 formation tops, including Lamar, Bell Canyon, Cherry Canyon.

Its 2 leases have reported 944K barrels of oil and 2.43M mcf of gas since November 2008, last reporting in July 2026. The leases carry 15 wells, so these are lease totals, not this well alone.

Operator of record

Jetta Operating Company Inc.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
605
Phone
(817) 639-2332

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJetta Operating Company Inc.
Production reportsJetta Operating Company, Inc.through Apr 2026
Latest permitJetta Operating Company, Inc.Jan 10, 2012
6,800
total depth, ft
1
permits on file
Jan 10, 2012
last permit issued
Aug 12, 2012
completed
944K
cumulative oil, bbl
2.43M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Nov 2008 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Aug 12, 2012
Shut in
—
Plugged
—

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 15 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Barstow 27 O-10-54813Collie (Delaware)Jetta Operating Company, Inc.8326K1.03MFeb 2020 – Jul 2026
Barstow 27 O-10-39202Scott (Cherry Canyon)Jetta Operating Company, Inc.7618K1.4MNov 2008 – Nov 2020

Oil, barrels lease total

Last 12 months 40,041 · prior 12 44,169(-9%)

02K4K6K202420252026

Gas, mcf lease total

Last 12 months 179,259 · prior 12 165,236(+8%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Jetta Operating Company, Inc.Nov 2008 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
730957-99DrillJetta Operating Company, Inc.Jan 4, 2012Jan 10, 2012Apr 30, 20126,800

Completions

CompletedLeaseFieldOperatorStatusDepth
—— O-10-39202————
—— O-10-54813————

Formation tops

As filed on W-2/G-1. Subsea from 2,563 ft elevation.Download CSV →

FormationMD ftSubsea
Lamar4,821-2,258
Bell Canyon4,850-2,287
Cherry Canyon5,791-3,228

Perforations

Perforated and open-hole intervals.

FromToType
5,2256,044Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.6251,39012.25900 S
5.56,5207.875250 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Oct 16, 2020Aug 21, 2012Yes
00Jul 22, 2013Aug 21, 2012Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47535973, documented in the API reference.