TEXAS · WELLS · WARD COUNTY · MILNER 46 LEASE · API 42-475-35987 · DISTRICT 7B

Milner 46 #1

WaterShut in

Ward County · Collie (Delaware) field · Shut In  · Vertical

Milner 46 #1 (API 42-475-35987) is a well in Ward County operated by Jetta Operating Company Inc., completed March 21, 2012 and listed as shut in on the RRC schedule, shut in June 1, 2023.

The RRC has issued one drilling permit, issued January 25, 2012, permitted to 8,147 ft.

It was permitted by Oxy USA Inc. and has since transferred to Jetta Operating Company Inc. on the wellbore schedule.

Completion filings report 3 formation tops, including Postelle, Brushy Canyon, Bspg.

No lease production has been reported under this well’s leases.

Operator of record

Jetta Operating Company Inc.

Permitted by OXY USA Inc.; the EWA schedule now lists a different operator.

Based in
Fort Worth, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jul 2, 2026
Permits on file
605
Phone
(817) 639-2332

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleJetta Operating Company Inc.
Production reportsnone
Latest permitOXY USA Inc.Jan 25, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,147
total depth, ft
1
permits on file
Jan 25, 2012
last permit issued
Mar 21, 2012
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 2013 THROUGH —

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Mar 21, 2012
Shut in
Jun 1, 2023
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Milner 46 O-10-44808Collie (Delaware)Jetta Operating Company, Inc.100Mar 2013 – —

No volumes reported on these leases in the last three years.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
731881-99DrillOXY USA Inc.Jan 18, 2012Jan 25, 2012Feb 19, 20129,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 21, 2012Milner 46 O-10-44808Collie (Delaware)Jetta Operating Company Inc.Shut In · shut in Jun 1, 20238,147

Formation tops

As filed on W-2/G-1. Subsea from 2,571 ft elevation.Download CSV →

FormationMD ftSubsea
Postelle6,201-3,630
Brushy Canyon6,785-4,214
Bspg8,028-5,457

Perforations

Perforated and open-hole intervals.

FromToType
6,6316,964Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6252,30512.251,140 S
78,1478.75550 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Mar 4, 2024Sep 28, 2023—
00Jul 24, 2014Nov 6, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it. The University Lands library has no per-well link: then paste it into its search.

Find logs withinmiles of this well:List →Map →

Beyond the permit record

RRC UIC permits · H-10 reported volumes

Injection

0
bbl, last 12 reported months
7.77M
bbl, all reported
Jul 2023
reported through
UICKindStatusPermitted bbl/dMax psiZone ft
000104895H-1 InjectionCanceled Mar 4, 202420,0003,3156,579–7,106

MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS

Last 12 months 0 · prior 12 643,818(-100%)

050K100K20222023

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47535987, documented in the API reference.