TEXAS · WELLS · WARD COUNTY · MONROE 1-10 LEASE · API 42-475-36015 · DISTRICT 7B
Monroe 1-10 #3H
Ward County · Phantom (Wolfcamp) field · NO Production · Horizontal
Monroe 1-10 #3H (API 42-475-36015) is a horizontal well in Ward County operated by Crescent Energy Operating LLC, completed November 3, 2012 and listed as no production on the RRC schedule, shut in July 1, 2026.
The RRC has issued one drilling permit (amended twice), issued March 9, 2012, permitted to 11,305 ft.
It was permitted by Cimarex Energy CO. and has since transferred to Crescent Energy Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Brushy Canyon, Bone Spring, Wolfcamp.
Its lease has reported 1.19M barrels of oil and 1.73M mcf of gas since July 2012, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.
Operator of record
Permitted by Cimarex Energy Co.; the EWA schedule now lists a different operator.
- Based in
- Houston, TX
- P-5 status
- Active (A)
- P-5 last filed
- Aug 28, 2025
- Permits on file
- 54
- Phone
- (713) 337-4600
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Crescent Energy Operating LLC |
| Production reports | Crescent Energy Operating, LLCthrough Apr 2026 |
| Latest permit | Cimarex Energy Co.Mar 9, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 11,305
- total depth, ft
- 3
- permits on file
- Mar 9, 2012
- last permit issued
- Nov 3, 2012
- completed
- 1.19M
- cumulative oil, bbl
- 1.73M
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jul 2012 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Nov 3, 2012
- Shut in
- Jul 1, 2026
- Plugged
- —
Operator's P-5 on the schedule: Active – Extension (X)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Monroe 1-10 O-10-43653 | Phantom (Wolfcamp) | Crescent Energy Operating, LLC | 2 | 1.19M | 1.73M | Jul 2012 – Jul 2026 |
Oil, barrels lease total
Last 12 months 32,585 · prior 12 27,840(+17%)
Gas, mcf lease total
Last 12 months 34,847 · prior 12 32,839(+6%)
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Cimarex Energy Co.Jul 2012 → Aug 2018
- 2Callon Petroleum Operating CoSep 2018 → Sep 2023
- 3Point Energy Partners Petro, LLCOct 2023 → Aug 2024
- 4Vital Energy, Inc.Sep 2024 → Dec 2025
- 5Crescent Energy Operating, LLCJan 2026 → Apr 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 734691-97 | Drill | Cimarex Energy Co. | Jun 19, 2013 | Mar 9, 2012 | Sep 4, 2012 | 11,500 |
| 734691-98 | Drill | Cimarex Energy Co. | Jun 21, 2012 | Mar 9, 2012 | — | 11,500 |
| 734691-99 | Drill | Cimarex Energy Co. | Feb 24, 2012 | Mar 9, 2012 | Sep 5, 2012 | 11,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Nov 3, 2012 | Monroe 1-10 O-10-43653 | Phantom (Wolfcamp) | Crescent Energy Operating LLC | NO Production · shut in Jul 1, 2026 | 11,305 |
Formation tops
As filed on W-2/G-1. Subsea from 2,708 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Brushy Canyon | 7,229 | -4,521 |
| Bone SpringTHIRD BONE SPRING D SAND | 11,153 | -8,445 |
| WolfcampWOLFCAMP X SAND | 11,188 | -8,480 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,535 | 15,622 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 5,048 | 12.25 | 550 S |
| 7 | 10,518 | 8.75 | 815 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Jan 15, 2014 | Feb 14, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-36015 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-36015 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47536015, documented in the API reference.