TEXAS · WELLS · WARD COUNTY · API 42-475-36144 · DISTRICT 7B
Monroe 34-220/211 Unit #1H
Ward County · Sandbar (Bone Spring) field · Shut In · Horizontal
Monroe 34-220/211 Unit #1H (API 42-475-36144) is a horizontal well in Ward County operated by Permian Resources Operating LLC, completed September 16, 2012 and listed as shut in on the RRC schedule, shut in May 1, 2023.
The RRC has issued 2 drilling permits between 2012 and 2017, permitted to 10,878 ft.
It was permitted by Anadarko E&P Onshore LLC and has since transferred to Permian Resources Operating LLC on the wellbore schedule.
Completion filings report one formation top, including Bone Spring.
Its 2 leases have reported 91.1K barrels of oil and 234K mcf of gas since September 2012, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.
Operator of record
Permian Resources Operating LLC
Permitted by Anadarko E&P Onshore LLC; the EWA schedule now lists a different operator.
- Based in
- Midland, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 25, 2025
- Permits on file
- 608
- Phone
- (432) 695-4222
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Permian Resources Operating LLC |
| Production reports | Anadarko E&P Onshore LLCthrough Dec 2022 |
| Latest permit | Anadarko E&P Onshore LLCMar 10, 2017 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 10,878
- total depth, ft
- 2
- permits on file
- Mar 10, 2017
- last permit issued
- Sep 16, 2012
- completed
- 91.1K
- cumulative oil, bbl
- 234K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Sep 2012 THROUGH Dec 2022
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Sep 16, 2012
- Shut in
- May 1, 2023
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Monroe 34-220/211 Unit O-10-48315 | Sandbar (Bone Spring) | Anadarko E&P Onshore LLC | 1 | 39.4K | 127K | Nov 2016 – Dec 2022 |
| Monroe 34-220/211 Unit O-10-42520 | Phantom (Wolfcamp) | Anadarko E&P Onshore LLC | 1 | 51.6K | 107K | Sep 2012 – Oct 2016 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Anadarko Petroleum CorporationSep 2012 → Mar 2013
- 2Anadarko E&P Onshore LLCApr 2013 → Dec 2022
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 823698-99 | Field transfer | Anadarko E&P Onshore LLC | Feb 23, 2017 | Mar 10, 2017 | Jul 20, 2012 | 16,000 |
| 740045-99 | Drill | Anadarko Petroleum Corporation | May 7, 2012 | May 17, 2012 | Jul 19, 2012 | 16,000 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Sep 16, 2012 | Monroe 34-220/211 Unit O-10-48315 | Sandbar (Bone Spring) | Permian Resources Operating LLC | Shut In · shut in May 1, 2023 | 10,878 |
| Sep 16, 2012 | Monroe 34-220/211 Unit O-10-42520 | Phantom (Wolfcamp) | Anadarko E&P Onshore LLC | Not on Schedule | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,680 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Bone SpringBONE SPRING 1 | 9,341 | -6,661 |
| Bone SpringBONE SPRING 2 | 10,009 | -7,329 |
| Bone SpringBONE SPRING 2 | 10,009 | -7,329 |
| Bone SpringBONE SPRING 3 | 10,821 | -8,141 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 11,405 | 14,775 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 4,995 | 12.25 | 1,860 S |
| 7 | 11,405 | 8.75 | 1,045 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Mar 27, 2017 | Mar 14, 2017 | — |
| 00 | Apr 30, 2013 | Feb 6, 2013 | Yes |
Well logs
1 log loaded from the RRC's log index, the latest received Aug 31, 2015. Resistivity. These are the logs loaded into Petrora from the Railroad Commission's inventories, not necessarily every log run on the well. The RRC holds the files; each opens from its log search for the well. The kind is the RRC's description of the log; the interval is the one filed for it.
Open the RRC's log search for this well ↗| Logas described | Files | Intervalft, as filed | Datereceived | SizeMB |
|---|---|---|---|---|
| RESISTIVITYSpans Bone Spring | TIFF | 10,176 to 15,281 | Aug 31, 2015run Aug 16, 2012 | 4.32 |
"Spans" is by this well's own filed formation tops: a formation runs from its top to the next deeper top filed, and the deepest runs to the bottom of the log. Depths are measured along the wellbore, so on a horizontal the lateral counts in the formation it was landed in.
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-36144 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-36144 → scanned completion filings
The logs loaded for this well are under Well logs, with the RRC's log search for it. The University Lands library has no per-well link: then paste it into its search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47536144, documented in the API reference.