TEXAS · WELLS · WARD COUNTY · BRAMBLETT 1-28 WRD LEASE · API 42-475-36197 · DISTRICT 7B

Bramblett 1-28 WRD #3H

Y

Ward County · Phantom (Wolfcamp) field · Producing  · Horizontal

Bramblett 1-28 Wrd #3H (API 42-475-36197) is a horizontal well in Ward County operated by Anadarko E&P Onshore LLC, completed May 31, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued August 6, 2012, permitted to 10,867 ft.

It was permitted by Chesapeake Operating, Inc. and has since transferred to Anadarko E&P Onshore LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Cherry Canyon, Brushy Canyon, Bone Spring.

Its lease has reported 924K barrels of oil and 2.39M mcf of gas since December 2012, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Anadarko E&P Onshore LLC

Permitted by Chesapeake Operating, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePdeh LLC
Production reportsPdeh LLCthrough Apr 2026
Latest permitChesapeake Operating, Inc.Aug 6, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

10,867
total depth, ft
1
permits on file
Aug 6, 2012
last permit issued
May 31, 2013
completed
924K
cumulative oil, bbl
2.39M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2012 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
May 31, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bramblett 1-28 WRD O-10-43462Phantom (Wolfcamp)Pdeh LLC4924K2.39MDec 2012 – Jul 2026

Oil, barrels lease total

Last 12 months 20,964 · prior 12 29,956(-30%)

02K4K202420252026

Gas, mcf lease total

Last 12 months 80,570 · prior 12 146,521(-45%)

010K20K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&PDec 2012 → Aug 2021
  2. 2Pdeh LLCSep 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
745355-99DrillChesapeake Operating, Inc.Jul 25, 2012Aug 6, 2012Dec 23, 201216,000

Completions

CompletedLeaseFieldOperatorStatusDepth
May 31, 2013Bramblett 1-28 WRD O-10-43462Phantom (Wolfcamp)Anadarko E&P Onshore LLCProducing10,867

Formation tops

As filed on W-2/G-1. Subsea from 2,684 ft elevation.Download CSV →

FormationMD ftSubsea
Cherry Canyon5,716-3,032
Brushy Canyon6,847-4,163
Bone Spring8,148-5,464

Perforations

Perforated and open-hole intervals.

FromToType
11,52615,261Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,40817.52,120 S
9.6254,69412.253,600 S
711,1688.751,000 S
711,1748.751,000 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 28, 2014Aug 16, 2013—
00Feb 27, 2014May 31, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47536197, documented in the API reference.