WELL · 42-475-36209 · DISTRICT 8
NWS Monahans #1
Ward County · C & M (Queen) field · Vertical
Nws Monahans #1 (API 42-475-36209) is a plugged well in Ward County, plugged October 16, 2023, last operated by Red Stag Operating LLC.
The RRC has issued one drilling permit, issued August 21, 2012, permitted to 5,500 ft.
It was permitted by Nabors Well Services CO. and has since transferred to Red Stag Operating LLC on the wellbore schedule.
Completion filings report 3 formation tops, including Yates, San Andres, Glorieta.
Operator of record
Permitted by Nabors Well Services Co.; the EWA schedule now lists a different operator.
Ozona, TX · P-5 Y, filed Dec 4, 2025 · (325) 226-3905
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Red Stag Operating LLC |
| Production reports | none |
| Latest permit | Nabors Well Services Co.Aug 21, 2012 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 5,500
- total depth, ft
- 1
- permits on file
- Aug 21, 2012
- last permit issued
- Jan 4, 2013
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 2013 THROUGH Jul 2026
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jan 4, 2013
- Shut in
- —
- Plugged
- Oct 16, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| NWS Monahans O-10-42949 | C & M (Queen) | Red Stag Operating, LLC | 1 | 0 | 0 | Jan 2013 – Jul 2026 |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 746295-99 | Drill | Nabors Well Services Co. | Aug 10, 2012 | Aug 21, 2012 | Dec 10, 2012 | 5,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-42949 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,608 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Yates | 2,330 | 278 |
| San Andres | 3,668 | -1,060 |
| GlorietaGLORIETTA | 4,740 | -2,132 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 3,740 | 5,250 | Open hole |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 850 | 12.25 | 345 S |
| 7 | 3,740 | 8.75 | 535 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Aug 7, 2013 | Mar 15, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-36209 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-36209 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
Beyond the permit record
RRC UIC permits · H-10 reported volumes
Injection
- 0
- bbl, last 12 reported months
- 1.3M
- bbl, all reported
- Jul 2024
- reported through
| UIC | Kind | Status | Permitted bbl/d | Max psi | Zone ft |
|---|---|---|---|---|---|
| 000105803 | W-14 Disposal | Plugged Jun 25, 2024 | 3,300 | 1,850 | 3,700–5,250 |
MONTHLY INJECTED, BBL · H-10 · LAST 24 REPORTED MONTHS
Last 12 months 0 · prior 12 0
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47536209, documented in the API reference.