WELL · 42-475-36214 · DISTRICT 8
Jaguar #2
Ward County · Scott (Cherry Canyon) field · Vertical
Jaguar #2 (API 42-475-36214) is a plugged well in Ward County, plugged June 5, 2023, last operated by Seaboard Operating CO..
The RRC has issued 2 drilling permits between 2012 and 2016, permitted to 6,700 ft.
Completion filings report 5 formation tops, including Rustler, Delaware, Ramsey, Olds.
Its 2 leases have reported 24.6K barrels of oil since February 2012, last reporting in February 2024. The leases carry 7 wells, so these are lease totals, not this well alone.
Operator of record
Midland, TX · P-5 Y, filed Apr 4, 2026 · 189 permits on file · (432) 425-7364
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Seaboard Operating Co. |
| Production reports | Seaboard Operating Co.through Apr 2023 |
| Latest permit | Seaboard Operating Co.Oct 13, 2016 |
- 6,700
- total depth, ft
- 2
- permits on file
- Oct 13, 2016
- last permit issued
- Apr 11, 2013
- completed
- 24.6K
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Feb 2012 THROUGH Feb 2024
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Apr 11, 2013
- Shut in
- —
- Plugged
- Jun 5, 2023
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 7 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Jaguar O-10-48092 | Collie (Delaware) | Seaboard Operating Co. | 4 | 11.9K | 0 | Dec 2014 – Feb 2024 |
| Jaguar O-10-44040 | Scott (Cherry Canyon) | Seaboard Operating Co. | 3 | 12.8K | 0 | Feb 2012 – Jul 2017 |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Seaboard Operating Co.Jun 2013 → Apr 2023
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 818782-99 | Field transfer | Seaboard Operating Co. | Sep 23, 2016 | Oct 13, 2016 | Oct 17, 2012 | 5,980 |
| 746570-99 | Drill | Seaboard Operating Co. | Aug 16, 2012 | Aug 24, 2012 | Oct 3, 2012 | 6,700 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — O-10-44040 | — | — | — | — |
| — | — O-10-48092 | — | — | — | — |
Formation tops
As filed on W-2/G-1. Subsea from 2,582 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Rustler | 1,240 | 1,342 |
| Delaware | 4,974 | -2,392 |
| Ramsey | 4,976 | -2,394 |
| Olds | 4,990 | -2,408 |
| Cherry Canyon | 5,900 | -3,318 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,010 | 5,050 | Perforated |
| 6,088 | 6,098 | Perforated |
| 6,145 | 6,157 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 1,261 | 12.25 | 915 S |
| 5.5 | 6,483 | 7.875 | 275 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Feb 10, 2017 | Sep 23, 2016 | Yes |
| 00 | Feb 24, 2014 | Jun 17, 2013 | Yes |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-475-36214 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-475-36214 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47536214, documented in the API reference.