TEXAS · WELLS · WARD COUNTY · MACDONALD 71 WRD UNIT 1H LEASE · API 42-475-36315 · DISTRICT 7B

Macdonald 71 WRD Unit 1H #1H

Shut in

Ward County · Phantom (Wolfcamp) field · Shut In  · Horizontal

Macdonald 71 Wrd Unit 1h #1H (API 42-475-36315) is a horizontal well in Ward County operated by Anadarko E&P Onshore LLC, completed September 10, 2013 and listed as shut in on the RRC schedule, shut in April 1, 2024.

The RRC has issued one drilling permit (amended once), issued December 13, 2012, permitted to 11,024 ft.

It was permitted by Shell Western E&P and has since transferred to Anadarko E&P Onshore LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Bs_ss3, Wc_sh1, W1.

Its lease has reported 465K barrels of oil and 884K mcf of gas since April 2013, last reporting in July 2026. The lease carries 2 wells, so these are lease totals, not this well alone.

Operator of record

Anadarko E&P Onshore LLC

Permitted by Shell Western E&P; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePdeh LLC
Production reportsPdeh LLCthrough Apr 2026
Latest permitShell Western E&PDec 13, 2012

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,024
total depth, ft
2
permits on file
Dec 13, 2012
last permit issued
Sep 10, 2013
completed
465K
cumulative oil, bbl
884K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Apr 2013 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Sep 10, 2013
Shut in
Apr 1, 2024
Plugged
—

Operator's P-5 on the schedule: Active – Extension (X)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Macdonald 71 WRD Unit 1H O-10-44136Phantom (Wolfcamp)Pdeh LLC2465K884KApr 2013 – Jul 2026

Oil, barrels lease total

Last 12 months 10,329 · prior 12 11,105(-7%)

01K2K202420252026

Gas, mcf lease total

Last 12 months 20,220 · prior 12 24,361(-17%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Shell Western E&PSep 2013 → Aug 2021
  2. 2Pdeh LLCSep 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
752660-98DrillShell Western E&PJan 22, 2013Dec 13, 2012Feb 13, 201312,000
752660-99DrillChesapeake Operating, Inc.Dec 5, 2012Dec 13, 2012—12,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 10, 2013Macdonald 71 WRD Unit 1H O-10-44136Phantom (Wolfcamp)Anadarko E&P Onshore LLCShut In · shut in Apr 1, 202411,024

Formation tops

As filed on W-2/G-1. Subsea from 2,712 ft elevation.Download CSV →

FormationMD ftSubsea
BS_SS310,923-8,211
WC_SH110,980-8,268
W111,031-8,319

Perforations

Perforated and open-hole intervals.

FromToType
11,63815,738Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,27017.51,585 S
9.6254,77212.251,610 S
9.3754,77212.251,610 S
711,3188.75920 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Mar 25, 2014Oct 2, 2013—
00Mar 6, 2014Jul 15, 2013Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47536315, documented in the API reference.