TEXAS · WELLS · WARD COUNTY · PRUETT 23 LEASE · API 42-475-36548 · DISTRICT 7B

Pruett 23 #2H

Y

Ward County · Two Georges (Bone Spring) field · Producing  · Horizontal

Pruett 23 #2H (API 42-475-36548) is a horizontal well in Ward County operated by Petro-Hunt Permian LLC, completed December 20, 2013 and listed as producing on the RRC schedule.

The RRC has issued one drilling permit, issued September 26, 2013, permitted to 11,114 ft.

It was permitted by Energen Resources Corporation and has since transferred to Petro-Hunt Permian LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Bone Spring, Lower B Sand, Top D Sand.

Its lease has reported 363K barrels of oil and 540K mcf of gas since December 2010, last reporting in July 2026. The lease carries 4 wells, so these are lease totals, not this well alone.

Operator of record

Petro-Hunt Permian LLC

Permitted by Energen Resources Corporation; the EWA schedule now lists a different operator.

Based in
Dallas, TX
P-5 status
Active (A)
P-5 last filed
Jan 27, 2026
Permits on file
250
Phone
(214) 880-8400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePetro-Hunt Permian LLC
Production reportsPetro-Hunt Permian, LLCthrough Apr 2026
Latest permitEnergen Resources CorporationSep 26, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,114
total depth, ft
1
permits on file
Sep 26, 2013
last permit issued
Dec 20, 2013
completed
363K
cumulative oil, bbl
540K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Dec 2010 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 20, 2013
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 4 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Pruett 23 O-10-41411Two Georges (Bone Spring)Petro-Hunt Permian, LLC4363K540KDec 2010 – Jul 2026

Oil, barrels lease total

Last 12 months 9,527 · prior 12 9,394(+1%)

05001K1.5K202420252026

Gas, mcf lease total

Last 12 months 18,687 · prior 12 19,859(-6%)

01K2K3K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Energen Resources CorporationDec 2010 → Jan 2019
  2. 2Diamondback E&P LLCFeb 2019 → Aug 2023
  3. 3Petro-Hunt Permian, LLCSep 2023 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
770230-99DrillEnergen Resources CorporationSep 18, 2013Sep 26, 2013Nov 13, 201311,500

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 20, 2013Pruett 23 O-10-41411Two Georges (Bone Spring)Petro-Hunt Permian LLCProducing11,114

Formation tops

As filed on W-2/G-1. Subsea from 2,715 ft elevation.Download CSV →

FormationMD ftSubsea
Bone Spring3RD BONE SPRING10,941-8,226
Lower B Sand11,152-8,437
Top D Sand11,216-8,501

Perforations

Perforated and open-hole intervals.

FromToType
11,89315,571Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.6254,94812.251,550 S
711,4208.751,400 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Sep 26, 2014Apr 29, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47536548, documented in the API reference.