WELL · 42-475-36551 · DISTRICT 8

Magic Man 33-64 WRD #5V

Plugged

Ward County · Phantom (Wolfcamp) field  · Vertical

Magic Man 33-64 Wrd #5V (API 42-475-36551) is a plugged well in Ward County, plugged September 17, 2025, last operated by Anadarko E&P Onshore LLC.

The RRC has issued one drilling permit (amended once), issued October 1, 2013, permitted to 14,000 ft.

It was permitted by Shell Western E&P and has since transferred to Anadarko E&P Onshore LLC on the wellbore schedule.

Completion filings report 3 formation tops, including Dlwr_gp, Avu_c, Wc_sh_b.

Its lease has reported 903K barrels of oil and 1.94M mcf of gas since August 2011, last reporting in July 2026. The lease carries 6 wells, so these are lease totals, not this well alone.

Operator of record

Anadarko E&P Onshore LLC

Permitted by Shell Western E&P; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active (A)
P-5 last filed
Oct 22, 2025
Permits on file
4,575
Phone
(713) 215-7000

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore schedulePdeh LLC
Production reportsPdeh LLCthrough Apr 2026
Latest permitShell Western E&POct 1, 2013

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

14,000
total depth, ft
2
permits on file
Oct 1, 2013
last permit issued
Dec 16, 2013
completed
903K
cumulative oil, bbl
1.94M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Aug 2011 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Dec 16, 2013
Shut in
—
Plugged
Sep 17, 2025

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; they carry 6 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Magic Man 33-64 WRD O-10-42019Phantom (Wolfcamp)Pdeh LLC6903K1.94MAug 2011 – Jul 2026

Oil, barrels lease total

Last 12 months 5,112 · prior 12 6,772(-25%)

01K2K3K202420252026

Gas, mcf lease total

Last 12 months 10,488 · prior 12 14,722(-29%)

02K4K6K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Chesapeake Operating, Inc.Aug 2011 → Sep 2012
  2. 2Shell Western E&POct 2012 → Aug 2021
  3. 3Pdeh LLCSep 2021 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
770574-98DrillShell Western E&PFeb 5, 2014Oct 1, 2013Nov 16, 201314,000
770574-99DrillShell Western E&PSep 24, 2013Oct 1, 2013Nov 16, 201314,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 16, 2013Magic Man 33-64 WRD O-10-42019Phantom (Wolfcamp)Anadarko E&P Onshore LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 2,644 ft elevation.Download CSV →

FormationMD ftSubsea
Dlwr_gp4,644-2,000
Avu_c8,128-5,484
Wc_sh_b11,031-8,387

Perforations

Perforated and open-hole intervals.

FromToType
11,24011,265Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
13.3751,24517.51,310 S
9.6254,58912.252,130 S
710,9938.75800 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jul 31, 2014Mar 12, 2014Yes

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward) and the University Lands library. then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47536551, documented in the API reference.