WELL · 42-479-30811 · DISTRICT 4
Callaghan Ranch #19
Webb County · Finley-Webb (5200) field · Vertical
Callaghan Ranch #19 (API 42-479-30811) is a plugged well in Webb County, plugged November 26, 2003, last operated by Mobil Producing TX. & N.M. Inc..
The RRC has issued 2 drilling permits (amended once) between 1991 and 1993, permitted to 6,650 ft.
Operator of record
Mobil Producing TX. & N.M. Inc.
- Based in
- Spring, TX
- P-5 status
- Active (A)
- P-5 last filed
- Jun 4, 2025
- Permits on file
- 6,763
- Phone
- (346) 474-9142
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Mobil Producing TX. & N.M. Inc. |
| Production reports | Mobil Producing TX. & N.M. Inc.through Aug 1998 |
| Latest permit | Mobil Producing TX. & N.M. Inc.Jul 1, 1993 |
- 6,650
- total depth, ft
- 3
- permits on file
- Jul 1, 1993
- last permit issued
- Jul 28, 1993
- completed
- 0
- cumulative oil, bbl
- 261K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Nov 2003
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Jul 28, 1993
- Shut in
- —
- Plugged
- Nov 26, 2003
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 3 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Callaghan Ranch G-4-146354 | Finley-Webb (5200) | Mobil Producing TX. & N.M. Inc. | 1 | 0 | 261K | Jul 1993 – Nov 2003 |
| Callaghan Ranch G-4-139837 | Finley-Webb (Wilcox 5600) | Mobil Producing TX. & N.M. Inc. | 1 | 0 | 0 | Jan 1993 – Jul 1993 |
| — G-4-70313 | — | — | 0 | 0 | 0 | — |
No volumes reported on these leases in the last three years.
Chain of custody
Every operator that reported production on this well's lease, in order.
- 1Mobil Producing TX. & N.M. Inc.Jul 1993 → Aug 1998
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 413413-98 | Recompletion | Mobil Producing TX. & N.M. Inc. | Aug 11, 1993 | Jul 1, 1993 | Jul 24, 1993 | 6,650 |
| 413413-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Jul 1, 1993 | Jul 1, 1993 | — | 6,650 |
| 386562-99 | Recompletion | Mobil Producing TX. & N.M. Inc. | Apr 9, 1991 | Apr 9, 1991 | May 31, 1991 | 6,650 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| — | — G-4-70313 | — | — | — | — |
| — | — G-4-139837 | — | — | — | — |
| — | — G-4-146354 | — | — | — | — |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,208 | 5,240 | Perforated |
| 5,565 | 5,595 | Perforated |
| 6,305 | 6,486 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 8.625 | 264 | 12.25 | 175 S |
| 5.5 | 6,647 | 7.875 | 425 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →
| Suffix | Filed | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Nov 15, 1993 | Aug 20, 1993 | Yes |
| 00 | Sep 8, 1993 | — | — |
| 00 | Jan 14, 1992 | Oct 21, 1991 | Yes |
| 00 | Nov 27, 1991 | — | — |
| 00 | Jan 12, 1984 | Mar 11, 1977 | — |
| 00 | Jan 12, 1984 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-30811 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-30811 → scanned completion filings
Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47930811, documented in the API reference.