WELL · 42-479-31022 · DISTRICT 4

Hubberd William C #2

Plugged

Webb County · Laredo (7900) field  · Vertical

Hubberd William C #2 (API 42-479-31022) is a plugged well in Webb County, plugged August 8, 2005, last operated by Forest Oil Corporation.

The RRC has issued one drilling permit, issued February 15, 2002, permitted to 8,853 ft.

It was permitted by Houston Exploration Company, The and has since transferred to Forest Oil Corporation on the wellbore schedule.

Operator of record

Forest Oil Corporation

Permitted by Houston Exploration Company, The; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Jan 6, 2016
Permits on file
1,861
Phone
(832) 242-9600

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleForest Oil Corporation
Production reportsHouston Exploration Company, Thethrough Aug 2005
Latest permitHouston Exploration Company, TheFeb 15, 2002

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

8,853
total depth, ft
1
permits on file
Feb 15, 2002
last permit issued
Feb 18, 2002
completed
0
cumulative oil, bbl
310K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Oct 2007

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Feb 18, 2002
Shut in
—
Plugged
Aug 8, 2005

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Hubberd, William "C" G-4-192358Laredo (7900)Forest Oil Corporation104.43KFeb 2002 – Oct 2007
Hubberd, William "C" G-4-67522Laredo (5680)Houston Exploration Company, The10306KJan 1993 – Aug 2005

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transamerican Natural Gas Corp.Jan 1993 → Jul 1993
  2. 2Transtexas Gas CorporationAug 1993 → May 1997
  3. 3Conoco Inc.Jun 1997 → Sep 2001
  4. 4Houston Exploration Company, TheFeb 2002 → Aug 2005

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
517558-99RecompletionHouston Exploration Company, TheFeb 12, 2002Feb 15, 2002Jan 30, 20028,853

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-67522————
—— G-4-192358————

Perforations

Perforated and open-hole intervals.

FromToType
7,6067,616Perforated
8,1918,218Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7582115350 S
76,5869.875500 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 20, 2003Jan 13, 2003Yes
00Jan 24, 2003——
00Jan 12, 1984Aug 18, 1976—
00Jan 12, 1984——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47931022, documented in the API reference.