TEXAS · WELLS · WEBB COUNTY · API 42-479-33177 · DISTRICT 04
Lessor Mary Etta #3
Webb County · Big Cowboy (Wilcox 5450) field · Vertical
Lessor Mary Etta #3 (API 42-479-33177) is a plugged well in Webb County, plugged December 22, 1993, last operated by Enron Oil & Gas Company.
The RRC has issued 3 drilling permits between 1981 and 1993, permitted to 7,300 ft.
Completion filings report 2 formation tops, including Queen City, Wilcox.
Operator of record
- Based in
- Houston, TX
- P-5 status
- Inactive (I)
- P-5 last filed
- Nov 4, 1998
- Permits on file
- 2,825
- Phone
- (713) 853-7245
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Enron Oil & Gas Company |
| Production reports | none |
| Latest permit | Enron Oil & Gas CompanyMay 25, 1993 |
- 7,300
- total depth, ft
- 3
- permits on file
- May 25, 1993
- last permit issued
- Mar 17, 1990
- completed
- 0
- cumulative oil, bbl
- 0
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —
Regulatory status · RRC wellbore file
- Schedule
- OFF SCHEDULE
- Completed
- Mar 17, 1990
- Shut in
- —
- Plugged
- Dec 22, 1993
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH APR 2026
Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| — G-4-98892 | — | — | 0 | 0 | 0 | — |
| Lessor, Mary Etta G-4-133931 | Big Cowboy (Wilcox 5450) | Enron Oil & Gas Company | 1 | 0 | 0 | Jan 1993 – — |
No volumes reported on these leases in the last three years.
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 411994-99 | Recompletion | Enron Oil & Gas Company | May 21, 1993 | May 25, 1993 | — | 4,850 |
| 368891-99 | Recompletion | Enron Oil & Gas Company | Jan 22, 1990 | Jan 23, 1990 | — | 5,900 |
| 139808-99 | Drill | HNG Oil Company | Nov 6, 1981 | Nov 6, 1981 | — | 7,300 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Mar 17, 1990 | Lessor Mary Etta G-4-133931 | Big Cowboy (Wilcox 5450) | Enron Oil & Gas Company | Plugged | — |
| Mar 16, 1982 | Lessor Mary Etta G-4-98892 | Big Cowboy (Wilcox 6000) | Enron Oil & Gas Company | Plugged | — |
Formation tops
As filed on W-2/G-1. Subsea from 469 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Queen City | 2,447 | -1,978 |
| Wilcox | 4,449 | -3,980 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 5,769 | 5,775 | Perforated |
| 5,987 | 5,995 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 9.625 | 515 | 12.25 | 275 S |
| 2.375 | 5,808 | — | — |
| 4.5 | 6,661 | 8.75 | — |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 17, 1990 | Apr 3, 1990 | Yes |
| 00 | Apr 10, 1990 | — | — |
| 00 | Jan 12, 1984 | Apr 8, 1982 | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-33177 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-33177 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47933177, documented in the API reference.