TEXAS · WELLS · WEBB COUNTY · VILLAREAL ET AL "745" LEASE · API 42-479-33810 · DISTRICT 04

Villareal et al 745 #1

Plugged

Webb County · Mirando City NW. (Wilcox 8700) field  · Vertical

Villareal ET AL 745 #1 (API 42-479-33810) is a plugged well in Webb County, plugged June 3, 1998, last operated by Killam Oil CO. Ltd..

The RRC has issued one drilling permit, issued January 24, 1984, permitted to 12,000 ft.

It was permitted by Killam Oil Company and has since transferred to Killam Oil CO. Ltd. on the wellbore schedule.

Completion filings report 5 formation tops, including Crockett, Queen City, Wilcox, Lobo 3.

Operator of record

Killam Oil Co. Ltd.

Permitted by Killam Oil Company; the EWA schedule now lists a different operator.

Based in
Laredo, TX
P-5 status
Active (A)
P-5 last filed
Apr 9, 2026
Permits on file
837
Phone
(956) 724-7141

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKillam Oil Co. Ltd.
Production reportsnone
Latest permitKillam Oil CompanyJan 24, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

12,000
total depth, ft
1
permits on file
Jan 24, 1984
last permit issued
Mar 28, 1984
completed
0
cumulative oil, bbl
0
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH —

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Mar 28, 1984
Shut in
—
Plugged
Jun 3, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Wells nearby

Every well with a location on file around this well, in any state, nearest first.

Loading the map…

Open the full map →

Texas locations come from drilling permits, so most older Texas wells have none and are not listed.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Villareal et al "745" G-4-111997Mirando City, NW. (Wilcox 8700)Killam Oil Co., Ltd.100Jan 1993 – —

No volumes reported on these leases in the last three years.

Wells named Villareal et al 745

Killam Oil Co. Ltd.'s other wells filed under this lease name in Webb County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.

Loading the lease's wells

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
227008-99DrillKillam Oil CompanyJan 20, 1984Jan 24, 1984—12,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Mar 28, 1984Villareal et al 745 G-4-111997Mirando City NW. (Wilcox 8700)Killam Oil Co. Ltd.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 628 ft elevation.Download CSV →

FormationMD ftSubsea
Crockett2,988-2,360
Queen City3,700-3,072
Wilcox6,173-5,545
WilcoxWILCOX 8700' SAND8,708-8,080
Lobo 310,170-9,542
Midway11,310-10,682

Perforations

Perforated and open-hole intervals.

FromToType
8,7098,717Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62553012.25240 sx
78,3958.75400 sx
2.87510,4376.125340 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 22, 1984Jul 18, 1984—
00Aug 18, 1984Jul 18, 1984—

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47933810, documented in the API reference.