WELL · 42-479-34058 · DISTRICT 4

Rodriguez Gas Unit #1 #1

Plugged

Webb County · Rodriguez (Lobo 6) field  · Vertical

Rodriguez Gas Unit #1 #1 (API 42-479-34058) is a plugged well in Webb County, plugged August 31, 1998, last operated by Sonat Exploration CO. - Houston.

The RRC has issued one drilling permit, issued December 11, 1984, permitted to 7,100 ft.

It was permitted by Tdc Engineering, Inc. and has since transferred to Sonat Exploration CO. - Houston on the wellbore schedule.

Completion filings report 3 formation tops, including Queen City, Carrizo, Lobo Sand.

Operator of record

Sonat Exploration Co. - Houston

Permitted by TDC Engineering, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Apr 15, 1993
Permits on file
197
Phone
(713) 940-4026

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleSonat Exploration Co. - Houston
Production reportsSonat Exploration Company -Tylerthrough Jun 1993
Latest permitTDC Engineering, Inc.Dec 11, 1984

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,100
total depth, ft
1
permits on file
Dec 11, 1984
last permit issued
May 10, 1985
completed
0
cumulative oil, bbl
28K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Aug 1998

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
May 10, 1985
Shut in
—
Plugged
Aug 31, 1998

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Rodriguez Gas Unit #1 G-4-116742Rodriguez (Lobo 6)Sonat Exploration Co. - Houston1028KJan 1993 – Aug 1998

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1TDC Engineering, Inc.Jan 1993 → Feb 1993
  2. 2Sonat Exploration Company -TylerMar 1993 → Jun 1993

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
260611-99DrillTDC Engineering, Inc.Dec 11, 1984Dec 11, 1984Dec 23, 19847,100

Completions

CompletedLeaseFieldOperatorStatusDepth
—— G-4-116742————

Formation tops

As filed on W-2/G-1. Subsea from 433 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City1,390-957
CarrizoCARRIZO WILCOX2,470-2,037
Lobo Sand6,100-5,667

Perforations

Perforated and open-hole intervals.

FromToType
6,1666,230Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7548514.75425 S
74,9509.875690 S
4.57,1006.75170 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Jun 18, 1985Jun 6, 1985—
00Jun 13, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47934058, documented in the API reference.