TEXAS · WELLS · WEBB COUNTY · API 42-479-34232 · DISTRICT 04

Jordan James #1

Y

Webb County · Benavides (Lobo Cons.) field · Producing  · Vertical

Jordan James #1 (API 42-479-34232) is a well in Webb County operated by Hilcorp Energy Company, completed December 27, 1991 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1985 and 1992, permitted to 9,281 ft.

It was permitted by Conoco Inc. and has since transferred to Hilcorp Energy Company on the wellbore schedule.

Completion filings report 7 formation tops, including Queen City, Carrizo, Wilcox, Walker.

No lease production has been reported under this well’s leases.

Operator of record

Hilcorp Energy Company

Permitted by Conoco Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Mar 27, 2026
Permits on file
3,454
Phone
(713) 209-2400

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleHilcorp Energy Company
Production reportsHilcorp Energy Companythrough Apr 2026
Latest permitConoco Inc.Jan 15, 1992

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

9,281
total depth, ft
2
permits on file
Jan 15, 1992
last permit issued
Dec 27, 1991
completed
0
cumulative oil, bbl
1.3M
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Dec 27, 1991
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Jordan, James G-4-140593Caprice (Lobo, Upper)Hilcorp Energy Company101.3MJan 1993 – Jul 2026
— G-4-119038——000—

Gas, mcf lease total

Last 12 months 12,983 · prior 12 13,690(-5%)

01K2K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Conoco Inc.Jan 1993 → Dec 2002
  2. 2Conocophillips CompanyJan 2003 → Dec 2015
  3. 3Hilcorp Energy CompanyJan 2016 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
395702-99RecompletionConoco Inc.Jan 9, 1992Jan 15, 1992Dec 17, 19919,281
283324-99DrillConoco Inc.Aug 26, 1985Aug 27, 1985Sep 11, 19859,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Dec 27, 1991Jordan James G-4-140593Benavides (Lobo Cons.)Hilcorp Energy CompanyProducing9,281
Nov 14, 1985Jordan James G-4-119038Caprice (Lobo)Conoco Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 538 ft elevation.Download CSV →

FormationMD ftSubsea
Queen City2,100-1,562
CarrizoCARRIZO WILCOX4,700-4,162
WilcoxWILCOX "A" MARKER7,300-6,762
WilcoxWILCOX (A) MARKER7,300-6,762
Walker8,140-7,602
Lobo 68,900-8,362
Lobo-69,000-8,462
Wills Point9,050-8,512

Perforations

Perforated and open-hole intervals.

FromToType
8,1628,182Perforated
8,9628,990Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.751,22514.75750 S
7.6257,1849.875650 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Feb 18, 1992Jan 8, 1992Yes
00Feb 14, 1992——
00Dec 12, 1985Nov 27, 1985Yes
00Dec 5, 1985——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47934232, documented in the API reference.