TEXAS · WELLS · WEBB COUNTY · API 42-479-34512 · DISTRICT 04

Lundell #53

Plugged

Webb County · Vaquillas Ranch (Lobo Cons.) field  · Vertical

Lundell #53 (API 42-479-34512) is a plugged well in Webb County, plugged February 23, 2001, last operated by Conoco Inc..

The RRC has issued 2 drilling permits between 1987 and 1996, permitted to 11,000 ft.

It was permitted by Transtexas Gas Corporation and has since transferred to Conoco Inc. on the wellbore schedule.

Completion filings report 4 formation tops, including Yegua, Queen City, Wilcox, Wills Point.

Operator of record

Conoco Inc.

Permitted by Transtexas Gas Corporation; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Inactive (I)
P-5 last filed
Aug 1, 2011
Permits on file
4,644
Phone
(281) 293-5562

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleConoco Inc.
Production reportsConoco Inc.through Jul 1999
Latest permitTranstexas Gas CorporationOct 17, 1996

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

11,000
total depth, ft
2
permits on file
Oct 17, 1996
last permit issued
Oct 26, 1996
completed
0
cumulative oil, bbl
11.4K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Feb 2001

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Oct 26, 1996
Shut in
—
Plugged
Feb 23, 2001

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Lundell G-4-160509Vaquillas Ranch (Lobo Cons.)Conoco Inc.1011.4KOct 1996 – Feb 2001
Lundell G-4-125048Gato Creek (9800)Transamerican Natural Gas Corp.100Jan 1993 – Oct 1996

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Transtexas Gas CorporationDec 1996 → May 1997
  2. 2Conoco Inc.Jun 1997 → Jul 1999

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
454005-99RecompletionTranstexas Gas CorporationOct 17, 1996Oct 17, 1996Oct 3, 199611,000
329473-99DrillTransamerican Natural Gas Corp.Apr 27, 1987Apr 30, 1987—11,000

Completions

CompletedLeaseFieldOperatorStatusDepth
Oct 26, 1996Lundell G-4-160509Vaquillas Ranch (Lobo Cons.)Conoco Inc.Plugged—
Jul 6, 1987Lundell G-4-125048Gato Creek (9800)Transamerican Natural Gas Corp.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 586 ft elevation.Download CSV →

FormationMD ftSubsea
Yegua1,980-1,394
Queen City3,385-2,799
WilcoxBASE LOWER WILCOX7,450-6,864
WilcoxLOWER WILCOX7,450-6,864
Wills PointTOP WILLS POINT10,600-10,014
Wills Point10,600-10,014

Perforations

Perforated and open-hole intervals.

FromToType
9,7049,724Perforated
10,18010,208Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
10.7574614.75530 S
7.6258,3009.875200 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 25, 1996Nov 7, 1996Yes
00Nov 14, 1996——
00Oct 13, 1987Jul 30, 1987Yes
00Sep 15, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47934512, documented in the API reference.