TEXAS · WELLS · WEBB COUNTY · API 42-479-34513 · DISTRICT 04

Benavides Rosa V. #C 3

Plugged

Webb County · Cole West (2900) field  · Vertical

Benavides Rosa V. #C 3 (API 42-479-34513) is a plugged well in Webb County, plugged July 25, 1989, last operated by Killam Oil Company.

The RRC has issued 2 drilling permits (amended once) in 1987, permitted to 3,730 ft.

Completion filings report 3 formation tops, including Mirando, Bruni, Mclean.

Operator of record

Killam Oil Company

Based in
Laredo, TX
P-5 status
Inactive (I)
P-5 last filed
Mar 31, 1993
Permits on file
160
Phone
(210) 724-7141

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKillam Oil Company
Production reportsnone
Latest permitKillam Oil CompanySep 16, 1987
3,730
total depth, ft
3
permits on file
Sep 16, 1987
last permit issued
Jun 3, 1987
completed
—
cumulative oil, bbl
—
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jun 3, 1987
Shut in
—
Plugged
Jul 25, 1989

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
335848-99RecompletionKillam Oil CompanySep 14, 1987Sep 16, 1987—3,730
329701-98DrillKillam Oil CompanyJul 9, 1987May 4, 1987—3,730
329701-99DrillKillam Oil CompanyMay 1, 1987May 4, 1987—3,700

Completions

CompletedLeaseFieldOperatorStatusDepth
Jun 3, 1987Benavides Rosa V. G-4-124579Cole West (2900)Killam Oil CompanyPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 798 ft elevation.Download CSV →

FormationMD ftSubsea
Mirando2,330-1,532
Bruni3,386-2,588
McLean3,574-2,776

Perforations

Perforated and open-hole intervals.

FromToType
2,9222,932Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62512012.2555 S
4.53,7007.625416 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Sep 3, 1987Jul 10, 1987Yes
00Aug 4, 1987——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47934513, documented in the API reference.