TEXAS · WELLS · WEBB COUNTY · HEREFORD -T- LEASE · API 42-479-34790 · DISTRICT 04
Hereford -T- #26
Webb County · Bashara-Hereford (7300) field · Producing · Vertical
- Fields on the latest permit · any of 2
- Bashara-Hereford (Navarro) · Bashara-Hereford (7300)
- Not one formation; the well must be completed in one of them, and no target formation is stated. The district's wildcat field is also on the permit.
Hereford -T- #26 (API 42-479-34790) is a well in Webb County operated by Merit Energy Company, completed February 13, 1989 and listed as producing on the RRC schedule.
The RRC has issued one drilling permit, issued December 12, 1988, permitted to 8,500 ft.
It was permitted by Transamerican Natural Gas Corp. and has since transferred to Merit Energy Company on the wellbore schedule.
Completion filings report 3 formation tops, including Wilcox, B/Carrizo, Wills Point.
Its lease has reported 2.22K barrels of oil and 449K mcf of gas since the record begins in January 1993, last reporting volume in August 2026.
Operator of record
Permitted by Transamerican Natural Gas Corp.; the EWA schedule now lists a different operator.
- Based in
- Dallas, TX
- P-5 status
- Active (A)
- P-5 last filed
- Nov 7, 2025
- Permits on file
- 1,049
- Phone
- (972) 701-8377
SOURCE · RRC EWA WELLBORE SCHEDULE
What each RRC source says
| Wellbore schedule | Merit Energy Company |
| Production reports | Merit Energy Companythrough Aug 2026 |
| Latest permit | Transamerican Natural Gas Corp.Dec 12, 1988 |
The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.
- 8,500
- total depth, ft
- 1
- permits on file
- Dec 12, 1988
- last permit issued
- Feb 13, 1989
- completed
- 2.22K
- cumulative oil, bbl
- 449K
- cumulative gas, mcf
PRODUCTION FROM PDQ LEASE REPORTS · ON RECORD FROM JAN 1993, THE RECORD'S FIRST MONTH, THROUGH AUG 2026
Regulatory status · RRC wellbore file
- Schedule
- ON SCHEDULE
- Completed
- Feb 13, 1989
- Shut in
- —
- Plugged
- —
Operator's P-5 on the schedule: Active (A)
Surface location
No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.
Wells nearby
Every well with a location on file around this well, in any state, nearest first.
Texas locations come from drilling permits, so most older Texas wells have none and are not listed.
Lease production
PDQ LEASE REPORTS · REPORTED THROUGH AUG 2026
Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →
| Lease | Field | Reporting operator | Wells | Oil, bbl | Gas, mcf | Reported |
|---|---|---|---|---|---|---|
| Hereford -T- G-4-130142 | Bashara-Hereford (7300) | Merit Energy Company | 1 | 2.22K | 449K | by Jan 1993 – Aug 2026 |
Gas, mcf lease total
Last 12 months 11,603 · prior 12 10,293(+13%)
Wells named Hereford -T-
Merit Energy Company's other wells filed under this lease name in Webb County, newest permit first. The RRC gives a gas well its own lease number, so the name is what joins the wells of a unit.
Loading the lease's wellsChain of custody
Every operator that reported production on this well's lease, in order.
- 1Transamerican Natural Gas Corp.Jan 1993 → Mar 1997
- 2North Central Oil Corp.Apr 1997 → Dec 2005
- 3Pogo Producing CompanyJan 2006 → Jan 2008
- 4Pogo Producing Company LLCFeb 2008 → Aug 2011
- 5Plains Exploration & Prod. Co.Sep 2011 → Feb 2012
- 6OXY USA Inc.Mar 2012 → Apr 2017
- 7Merit Energy CompanyMay 2017 → Aug 2026
Permits
| Permit | Type | Operator | Received | Issued | Spud | Depth |
|---|---|---|---|---|---|---|
| 354152-99 | Drill | Transamerican Natural Gas Corp. | Dec 12, 1988 | Dec 12, 1988 | — | 8,500 |
Completions
| Completed | Lease | Field | Operator | Status | Depth |
|---|---|---|---|---|---|
| Feb 13, 1989 | Hereford -T- G-4-130142 | Bashara-Hereford (7300) | Merit Energy Company | Producing | 8,500 |
Formation tops
As filed on W-2/G-1. Subsea from 489 ft elevation.Download CSV →
| Formation | MD ft | Subsea |
|---|---|---|
| Wilcox | 3,288 | -2,799 |
| B/Carrizo | 4,569 | -4,080 |
| Wills Point | 7,730 | -7,241 |
Perforations
Perforated and open-hole intervals.
| From | To | Type |
|---|---|---|
| 7,286 | 7,326 | Perforated |
Casing
Strings as reported, shallowest first.
| Casing in | Set at | Hole in | Cement |
|---|---|---|---|
| 10.75 | 860 | 14.75 | 600 S |
| 7.625 | 6,198 | 9.875 | 365 S |
| 5 | 8,500 | 6.75 | 325 S |
Completion filings
W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →
| Suffix | RRC record date | W-2 / G-1 date | Logs referenced |
|---|---|---|---|
| 00 | Apr 18, 1989 | Mar 14, 1989 | Yes |
| 00 | Apr 4, 1989 | — | — |
The source documents
Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.
- Wellbore filings for 42-479-34790 → W-2, G-1, plugging reports, as PDFs
- Completion packets for 42-479-34790 → scanned completion filings
Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.
About this data
Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.
New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease
Developers: this page as JSON is GET /v1/data/wells/47934790, documented in the API reference.