TEXAS · WELLS · WEBB COUNTY · API 42-479-34794 · DISTRICT 04

Garner #1

Y

Webb County · Tom Walsh (Olmos) field · Producing  · Vertical

Fields on the latest permit · any of 2
Tom Walsh (Escondido) · Tom Walsh (Olmos)
Not one formation; the well must be completed in one of them, and no target formation is stated.

Garner #1 (API 42-479-34794) is a well in Webb County operated by Lewis Petro Properties Inc., completed November 10, 1989 and listed as producing on the RRC schedule.

The RRC has issued 2 drilling permits between 1988 and 1990, permitted to 7,100 ft.

Completion filings report 2 formation tops, including Escondido, Olmos.

Its 2 leases have reported 1.11K barrels of oil and 542K mcf of gas since January 1993, last reporting volume in April 2026.

Operator of record

Lewis Petro Properties Inc.

Based in
San Antonio, TX
P-5 status
Active (A)
P-5 last filed
Jan 28, 2026
Permits on file
3,007
Phone
(210) 384-3200

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleLewis Petro Properties Inc.
Production reportsLewis Petro Properties, Inc.through Apr 2026
Latest permitLewis Petro Properties, Inc.May 22, 1990
7,100
total depth, ft
2
permits on file
May 22, 1990
last permit issued
Nov 10, 1989
completed
1.11K
cumulative oil, bbl
542K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Mar 1993 THROUGH Apr 2026

Regulatory status · RRC wellbore file

Schedule
ON SCHEDULE
Completed
Nov 10, 1989
Shut in
—
Plugged
—

Operator's P-5 on the schedule: Active (A)

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Garner G-4-134822Tom Walsh (Olmos)Lewis Petro Properties, Inc.11.11K542KJan 1993 – Apr 2026
— O-4-11623——000—

Gas, mcf lease total

Last 12 months 6,476 · prior 12 11,205(-42%)

05001K1.5K202420252026

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Lewis Petro Properties, Inc.Mar 1993 → Apr 2026

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
371532-99RecompletionLewis Petro Properties, Inc.Mar 28, 1990May 22, 1990—7,100
354411-99DrillLewis Petro Properties, Inc.Dec 19, 1988Dec 27, 1988—7,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Nov 10, 1989Garner G-4-134822Tom Walsh (Olmos)Lewis Petro Properties Inc.Producing7,100
Apr 15, 1989Garner Ranch O-4-11623Tom Walsh (Escondido)Lewis Petro Properties Inc.Not on Schedule—

Formation tops

As filed on W-2/G-1. Subsea from 645 ft elevation.Download CSV →

FormationMD ftSubsea
Escondido5,130-4,485
Escondido5,131-4,486
OlmosOLMOS A6,834-6,189
OlmosOLMOS A6,835-6,190
OlmosOLMOS B6,929-6,284

Perforations

Perforated and open-hole intervals.

FromToType
5,1315,138Perforated
6,8536,927Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
8.62572711235 S
8.62572712.25—
4.57,1007.875—

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Aug 17, 1990Mar 2, 1990Yes
00Jun 9, 1990——
00Jun 28, 1989May 10, 1989Yes
00Jun 14, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47934794, documented in the API reference.