TEXAS · WELLS · WEBB COUNTY · JOHNSON LEASE · API 42-479-34827 · DISTRICT 04

Johnson #2

Plugged

Webb County · San Idelfonso (Lobo) field  · Vertical

Johnson #2 (API 42-479-34827) is a plugged well in Webb County, plugged March 18, 2024, last operated by Columbus Energy LLC.

The RRC has issued one drilling permit, issued February 24, 1989, permitted to 7,200 ft.

It was permitted by Tdc Engineering, Inc. and has since transferred to Columbus Energy LLC on the wellbore schedule.

Completion filings report 2 formation tops, including Lobo 1, Lobo 6.

Operator of record

Columbus Energy LLC

Permitted by TDC Engineering, Inc.; the EWA schedule now lists a different operator.

Based in
Houston, TX
P-5 status
Active – Extension (X)
P-5 last filed
Jun 2, 2026
Permits on file
51
Phone
(832) 432-8540

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleColumbus Energy LLC
Production reportsColumbus Energy, LLCthrough Dec 2020
Latest permitTDC Engineering, Inc.Feb 24, 1989

The sources disagree, which usually means a transfer or a lease-level production filing by a different entity. Petrora goes with the schedule.

7,200
total depth, ft
1
permits on file
Feb 24, 1989
last permit issued
Sep 25, 1994
completed
0
cumulative oil, bbl
486K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jul 2026

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Sep 25, 1994
Shut in
—
Plugged
Mar 18, 2024

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the lease this well is completed on; this well is the only one on it.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Johnson G-4-130409San Idelfonso (Lobo)Columbus Energy, LLC10486KJan 1993 – Jul 2026

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1TDC Engineering, Inc.Jan 1993 → Feb 1993
  2. 2Sonat Exploration Company -TylerMar 1993 → Nov 1993
  3. 3Sonat Exploration Co. - HoustonDec 1993 → Oct 1998
  4. 4Cliffwood Production Co.Nov 1998 → Feb 2001
  5. 5Ocean Energy, Inc.Mar 2001 → Aug 2003
  6. 6Devon Louisiana CorporationSep 2003 → Apr 2005
  7. 7Legend Natural Gas II, LPMay 2005 → Dec 2006
  8. 8Houston Exploration Company, TheJan 2007 → Jun 2007
  9. 9Forest Oil CorporationJul 2007 → Sep 2008
  10. 10Columbus Energy, LLCOct 2008 → Dec 2020

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
356413-99DrillTDC Engineering, Inc.Feb 24, 1989Feb 24, 1989—7,200

Completions

CompletedLeaseFieldOperatorStatusDepth
Sep 25, 1994Johnson G-4-130409San Idelfonso (Lobo)Columbus Energy LLCPlugged—

Formation tops

As filed on W-2/G-1. Subsea from 4,075 ft elevation.Download CSV →

FormationMD ftSubsea
Lobo 15,850-1,775
Lobo 66,500-2,425

Perforations

Perforated and open-hole intervals.

FromToType
5,8845,890Perforated
5,9325,937Perforated
5,9776,048Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62551212.25160 S
75,1008.5170 S
4.56,8006.125240 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. About these reports →

SuffixFiledW-2 / G-1 dateLogs referenced
00Nov 22, 1994Oct 25, 1994—
00May 24, 1989Apr 14, 1989Yes
00Apr 20, 1989——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images are in archives with no per-well link: the RRC's Neubus archive (2004 onward). then paste it into their search.

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47934827, documented in the API reference.