TEXAS · WELLS · WEBB COUNTY · API 42-479-34967 · DISTRICT 04

Bruni Mineral A #12

Plugged

Webb County · Juanita (Wilcox 8100) field  · Directional · Sidetrack

Bruni Mineral A #12 (API 42-479-34967) is a plugged well in Webb County, plugged April 13, 2018, last operated by Killam Oil CO. Ltd..

The RRC has issued 2 drilling permits (amended once) between 1990 and 2015, permitted to 11,300 ft.

Completion filings report 3 formation tops, including Wilcox, Lobo, Midway.

Its 2 leases have reported 680 barrels of oil and 306K mcf of gas since January 1993, with no volume in the three years through April 2026. The leases carry 2 wells, so these are lease totals, not this well alone.

Operator of record

Killam Oil Co. Ltd.

Based in
Laredo, TX
P-5 status
Active (A)
P-5 last filed
Apr 9, 2026
Permits on file
837
Phone
(956) 724-7141

SOURCE · RRC EWA WELLBORE SCHEDULE

What each RRC source says

Wellbore scheduleKillam Oil Co. Ltd.
Production reportsKillam Oil Co., Ltd.through Jan 2016
Latest permitKillam Oil Co., Ltd.Oct 26, 2015
11,300
total depth, ft
3
permits on file
Oct 26, 2015
last permit issued
Jul 27, 2015
completed
680
cumulative oil, bbl
306K
cumulative gas, mcf

PRODUCTION FROM PDQ LEASE REPORTS · Jan 1993 THROUGH Jan 2016

Regulatory status · RRC wellbore file

Schedule
OFF SCHEDULE
Completed
Jul 27, 2015
Shut in
—
Plugged
Apr 13, 2018

Surface location

No coordinates on the permit record yet. The RRC's GIS record usually lands within days of issuance; historical master-file permits never carry one.

Lease production

PDQ LEASE REPORTS · REPORTED THROUGH APR 2026

Texas reports oil by lease, not by well. These are the 2 leases this well is completed on; they carry 2 wells in total, so volumes are shared.Why →

LeaseFieldReporting operatorWellsOil, bblGas, mcfReported
Bruni Mineral 'A' G-4-278557Juanita (Wilcox 8100)Killam Oil Co., Ltd.1166.3KJul 2015 – Jan 2016
Bruni Mineral -A- G-4-134539B.M.T. (Lobo Cons.)Killam Oil Co., Ltd.1664300KJan 1993 – Oct 2011

No volumes reported on these leases in the last three years.

Chain of custody

Every operator that reported production on this well's lease, in order.

  1. 1Enron Oil & Gas CompanyJan 1993 → Oct 1995
  2. 2Killam Oil Co., Ltd.Nov 1995 → Jan 2016

Permits

PermitTypeOperatorReceivedIssuedSpudDepth
811075-99RecompletionKillam Oil Co., Ltd.Oct 9, 2015Oct 26, 2015Jul 24, 20159,680
367984-98Drill · sidetrackEnron Oil & Gas CompanyFeb 15, 1990Jan 2, 1990—11,300
367984-99DrillEnron Oil & Gas CompanyDec 27, 1989Jan 2, 1990—11,300

Completions

CompletedLeaseFieldOperatorStatusDepth
Jul 27, 2015Bruni Mineral A G-4-278557Juanita (Wilcox 8100)Killam Oil Co. Ltd.Plugged—
Feb 28, 1990Bruni Mineral -A- G-4-134539B.M.T. (Lobo Cons.)Killam Oil Co. Ltd.Plugged—

Formation tops

As filed on W-2/G-1. Subsea from 445 ft elevation.Download CSV →

FormationMD ftSubsea
Wilcox4,950-4,505
WilcoxWILCOX 81008,056-7,611
Lobo8,915-8,470
Midway9,860-9,415

Perforations

Perforated and open-hole intervals.

FromToType
8,0598,061Perforated
8,0748,093Perforated
8,1208,130Perforated
9,7769,796Perforated

Casing

Strings as reported, shallowest first.

Casing inSet atHole inCement
9.62599812.25345 S
77,4008.75285 S
2.87510,1506.25440 S

Completion filings

W-2 and G-1 reports on record in the RRC wellbore file, newest first. The suffix identifies the wellbore or completion event. The record date is the RRC's own date on the record, not the day the report was filed: 462,034 of the state's filings carry 1984-01-12. About these reports →

SuffixRRC record dateW-2 / G-1 dateLogs referenced
00Dec 10, 2015Nov 6, 2015—
00Jan 21, 1993Dec 1, 1992—
00Aug 21, 1990Mar 26, 1990Yes
00Aug 4, 1990——

The source documents

Petrora holds the structured record. The scanned filings live at the RRC; these links open its search already filled in for this API.

Log images filed since 2004 open from the RRC's log search for this well; none are loaded here for it.

Find logs withinmiles of this well:List →Map →

About this data

Permits from the RRC OGA049M master and daily daf420 files; wellbore and operator of record from the EWA schedule, weekly; completions, formation tops, casing, and perforations from the dbf900 wellbore file; production from PDQ lease reports, which lag two to three months; injection from UIC permits, H-10 reports, and TexNet daily volumes; earthquakes from the TexNet catalog.

New to these records? How to read a well page · API numbers · completion reports and tops · why production is by lease

Developers: this page as JSON is GET /v1/data/wells/47934967, documented in the API reference.